[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-882585":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},882585,570,1,"单选题","盈亏平衡分析是一种特殊形式的临界点分析，它适用于财务评价，其计算应按项目投产后以下哪项计算？",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","正常年份的销售收入和成本费用数据利润总额",true,{"key":16,"text":17,"correct":18},"B","计算期内的平均值",false,{"key":20,"text":21,"correct":18},"C","年产量",{"key":23,"text":24,"correct":18},"D","单位产品销售价格","提示 盈亏平衡分析应按项目投产后，正常年份的销售收入和成本费用数据利润总额进行计算。",{"id":6,"name":27,"category":28,"favorite":29},"注册环保工程师 - 公共基础","建筑工程",0]