[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-882541":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},882541,570,1,"单选题","生产性项目总投资包括铺底流动资金和：",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","设备工器具投资",false,{"key":16,"text":17,"correct":14},"B","建筑安装工程投资",{"key":19,"text":20,"correct":14},"C","流动资金",{"key":22,"text":23,"correct":24},"D","建设投资",true,"提示 生产性项目总投资包括建设投资、建设期贷款利息和铺底流动资金（粗略计算时，建设期贷款利息可并入建设投资）。",{"id":6,"name":27,"category":28,"favorite":29},"注册环保工程师 - 公共基础","建筑工程",0]