[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-881904":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},881904,569,1,"单选题","某宾馆进行建筑节能分部工程验收，空调系统为风机盘管十新风系统，该宾馆安装有40台风机盘管和2台新风机组，正确的检查数量应是下列哪一项？",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","风机盘管抽查4台，新风机组抽查1台",false,{"key":16,"text":17,"correct":14},"B","风机盘管抽查4台，新风机组抽查2台",{"key":19,"text":20,"correct":21},"C","风机盘管抽查5台，新风机组抽查1台",true,{"key":23,"text":24,"correct":14},"D","风机盘管抽查5台，新风机组抽查2台","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（暖通空调专业）","建筑工程",0]