[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-881671":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},881671,569,1,"单选题","生产厂房的空调系统在无生产负荷的联合试运转及调试中，不符合规定的调试要求应是下列哪一项？( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","系统总风量测试结果与设计风量偏差不应大于10%",false,{"key":16,"text":17,"correct":14},"B","系统冷热水、冷却水总流量测试结果与设计流量的偏差不应大于10%",{"key":19,"text":20,"correct":14},"C","空调室内噪声应符合设计规定要求",{"key":22,"text":23,"correct":24},"D","系统平衡调整后，各空调机组的水流量应符合设计要求，允许偏差为15%",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（暖通空调专业）","建筑工程",0]