[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-881607":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},881607,569,2,"多选题","蒸汽热力网管道采用地下敷设时，应优先采用下列何种方式?( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","直埋敷设",true,{"key":16,"text":17,"correct":14},"B","不通行管沟敷设",{"key":19,"text":20,"correct":21},"C","半通行管沟敷设",false,{"key":23,"text":24,"correct":21},"D","通行管沟敷设","AB","(1)蒸汽管道采用地下敷设时有两种方式，即地沟敷设和无沟直埋。其中地沟敷若没有特殊要求时首先选不通行地沟，经济合理。(2)《城镇供热管网设计规范》CJJ34-2010第8.2.4条：热水或蒸汽管道采用管沟敷设时，宜采用不通行管沟敷设，穿越不允许开挖检修的地段时，应采用通行管沟敷设。结合第8.2.5条条文说明：蒸汽管道管沟敷设有时存在困难，例如地下水位高等，因此最好也采用直埋敷设。据此推出，蒸汽管道管沟敷设没有困难时，结合第8.2.4条，应优先采用不通行管沟敷设。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（暖通空调专业）","建筑工程",0]