[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-881236":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},881236,569,2,"多选题","下列设备和管道安装时，哪些说法是正确的?( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","A.热量表安装时，上游侧直管段长度不应小于5下游侧直管段长度不应小于2D",true,{"key":16,"text":17,"correct":18},"B","风管测定孔与前后局部配件间的距离宜分别保持不小于5D和2D",false,{"key":20,"text":21,"correct":18},"C","矩形风管平面边长大于500mm，且曲率半径小于1倍的平面边长时，应设置弯管导流叶片",{"key":23,"text":24,"correct":14},"D","制冷剂管道弯管的弯曲半径不应小于3.5D","AD","选项A见《供热计量技术规程》JGJ173-2009第3.0.6条文说明。选项B见《民规》第6.6.12条文说明。选项C见《民规》第6.6.11条。选项D见《通风与空调工程施工质量验收规范》GB50243-2002第8.3.4-2条。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（暖通空调专业）","建筑工程",0]