[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-880797":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},880797,569,2,"多选题","《地源热泵系统工程技术规范(2009年版)》GB50036进行了重要修订的是下列哪几项？",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","统一规范岩土热响应试验方法",true,{"key":16,"text":17,"correct":18},"B","明确提出对于利用地埋管地源热源系统的建筑，当应用建筑面积大于式等于3000㎡时，应进行热响应试验",false,{"key":20,"text":21,"correct":14},"C","明确提出岩土热响应试验应符合附录C的规定",{"key":23,"text":24,"correct":18},"D","提出地埋管换热器计算时，环路集管不应包括在地埋管换热器长度内","AC","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（暖通空调专业）","建筑工程",0]