[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-880771":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},880771,569,2,"多选题","改善重力沉降室的捕集效率的设计途径有( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","降低沉降室内气流速度",true,{"key":16,"text":17,"correct":18},"B","增大沉降室高度",false,{"key":20,"text":21,"correct":14},"C","增加重力沉降室的长度",{"key":23,"text":24,"correct":14},"D","增加重力沉降室的过流断面","ACD","",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（暖通空调专业）","建筑工程",0]