[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-880082":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},880082,569,1,"单选题","在进行高层建筑热水系统的竖向分区时，其分区应( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","与冷水系统分区一致",true,{"key":16,"text":17,"correct":18},"B","按卫生器具给水配件的最大工作压力进行",false,{"key":20,"text":21,"correct":18},"C","采用减压阀分区方式",{"key":23,"text":24,"correct":18},"D","采用分区热水箱供水方式","高层建筑热水系统的分区，应与冷水系统的分区一致。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（暖通空调专业）","建筑工程",0]