[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-568-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":627},{"id":5,"name":6,"category":7,"favorite":8},568,"专业知识（给排水）","建筑工程",0,14,50,1213,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,404,416,428,440,452,464,476,488,500,512,524,536,548,563,575,588,601,614],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},879286,1,"单选题","在排洪沟设计中，下述哪种说法是错误的？( )",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","排洪沟断面常设计为矩形或梯形，超高采用0.3～0.5m",false,{"key":24,"text":25,"correct":22},"B","排洪沟一般尽量采用明渠，但通过市区或厂区时采用暗渠",{"key":27,"text":28,"correct":22},"C","我国山洪洪峰流量计算采用的主要方法有洪水调查法、推理公式法和经验公式法",{"key":30,"text":31,"correct":32},"D","排洪沟穿越交通主干道时采用盖板明渠",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},879287,"下列关于同一千重污泥的体积、含水质量、含水率和含固体浓度之间的关系描述中，哪项错误？( )",[38,40,42,44],{"key":20,"text":39,"correct":22},"污泥的体积与含水质量成正比",{"key":24,"text":41,"correct":22},"污泥的含水率与污泥体积成正比",{"key":27,"text":43,"correct":22},"污泥含水质量与含固体物浓度成反比",{"key":30,"text":45,"correct":32},"污泥体积与含固体物浓度成正比",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},879288,"下列关于雨水管渠设计计算方法或参数取值的说法中，哪项正确？( )",[50,52,54,56],{"key":20,"text":51,"correct":22},"建筑密度较小地区集水时间取较小值",{"key":24,"text":53,"correct":32},"同一排水系统可以采用不同的重现期",{"key":27,"text":55,"correct":22},"雨水和污水管道的最小设计流速相同",{"key":30,"text":57,"correct":22},"重力流雨水管道应按不满流设计",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},879289,"下列关于不同直径排水管道连接方式，哪项不正确？( )",[62,64,66,68],{"key":20,"text":63,"correct":22},"生活污水管道采用水面平接",{"key":24,"text":65,"correct":22},"工业污水管道采用管顶平接",{"key":27,"text":67,"correct":22},"雨水管道采用管顶平接",{"key":30,"text":69,"correct":32},"合流管道采用管底平接",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},879290,"下列关于污水自然处理的规划设计原则，哪一项是不正确的？( )",[74,76,78,80],{"key":20,"text":75,"correct":22},"污水厂二级处理出水可采用人工湿地深度净化后用于景观补充水",{"key":24,"text":77,"correct":32},"在城市给水水库附近建设的污水氧化塘需要做防渗处理",{"key":27,"text":79,"correct":22},"污水进入人工湿地前，需设置格栅、沉砂、沉淀等预处理设施",{"key":30,"text":81,"correct":22},"污水土地处理设施，距高速公路150m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},879291,"某生猪屠宰企业排出的废水悬浮物浓度为500mg\u002FL，并含有一定量的猪毛，拟采用气浮处理方法。选择下述哪项气浮工艺是最合适的？( )",[86,88,90,92],{"key":20,"text":87,"correct":22},"溶气真空气浮工艺",{"key":24,"text":89,"correct":22},"全加压溶气气浮工艺",{"key":27,"text":91,"correct":22},"部分加压溶气气浮工艺",{"key":30,"text":93,"correct":32},"回流加压溶气气浮工艺",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},879292,"工业废水调节池设置机械搅拌装置的目的主要是下列哪项？( )",[98,100,102,104],{"key":20,"text":99,"correct":22},"保持水量平衡",{"key":24,"text":101,"correct":22},"减小调节池容积",{"key":27,"text":103,"correct":22},"防止浮渣结壳",{"key":30,"text":105,"correct":32},"防止杂质沉淀",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},879293,"关于工业废水排水系统，下列说法哪项正确？( )",[110,112,114,116],{"key":20,"text":111,"correct":22},"工业废水必须单独处理，不得排入城镇排水系统",{"key":24,"text":113,"correct":22},"工业废水应直接排入城镇排水系统与城镇污水合并处理",{"key":27,"text":115,"correct":22},"工业废水应在工厂内部循环利用，不得外排",{"key":30,"text":117,"correct":32},"工业废水排入城镇排水系统的前提是不得影响城镇排水系统的正常运行",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},879294,"下面关于隔油池的说法中，不正确的是哪项？( )",[122,124,126,128],{"key":20,"text":123,"correct":22},"隔油池表面积修正系数与水流紊动状态有关",{"key":24,"text":125,"correct":22},"隔油池表面积修正系数与隔油池池容积利用率有关",{"key":27,"text":127,"correct":22},"废水悬浮物引起的颗粒碰撞阻力系数与悬浮物浓度有关",{"key":30,"text":129,"correct":32},"废水悬浮物引起的颗粒碰撞阻力系数与悬浮物浓度无关",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},879295,"某工厂废水中的石油浓度为100mg\u002FL，油珠粒径为0.08～0.15μm，应选择下列哪种处理装置？( )",[134,136,138,140],{"key":20,"text":135,"correct":22},"平流隔油池",{"key":24,"text":137,"correct":22},"斜板隔油池",{"key":27,"text":139,"correct":32},"混凝气浮池",{"key":30,"text":141,"correct":22},"生物处理法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},879296,"污水处理厂的设计规模、污泥产气量是根据以下哪种流量计算的？( )",[146,148,150,152],{"key":20,"text":147,"correct":22},"最高日最大时流量",{"key":24,"text":149,"correct":22},"提升泵站设计流量",{"key":27,"text":151,"correct":32},"平均日流量",{"key":30,"text":153,"correct":22},"最高日平均时流量",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},879297,"下列活性污泥法污水处理系统基本组成的描述中，哪一项是正确的？( )",[158,160,162,164],{"key":20,"text":159,"correct":22},"初沉池、曝气池、二沉池、污泥浓缩池",{"key":24,"text":161,"correct":22},"活性污泥反应器、二沉池、污泥消化池、剩余污泥处理系统",{"key":27,"text":163,"correct":32},"曝气池、二沉池、污泥回流系统、曝气系统",{"key":30,"text":165,"correct":22},"初沉池、活性污泥反应器、进水管路系统、搅拌混合系统",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":168,"answer":27,"analysis":33},879298,[169,171,173,175],{"key":20,"text":170,"correct":22},"气浮",{"key":24,"text":172,"correct":22},"混凝沉淀",{"key":27,"text":174,"correct":32},"厌氧生物处理",{"key":30,"text":176,"correct":22},"过滤",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":30,"analysis":33},879299,"排水系统采用下述哪种排水体制时，初期建设规模最小？( )",[181,183,185,187],{"key":20,"text":182,"correct":22},"合流制",{"key":24,"text":184,"correct":22},"截流式合流制",{"key":27,"text":186,"correct":22},"分流制",{"key":30,"text":188,"correct":32},"不完全分流制",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},879300,"关于污水处理中格栅栅渣输送设备的选择，下述哪种说法是正确的？( )",[193,195,197,199],{"key":20,"text":194,"correct":22},"细格栅栅渣宜采用带式输送机输送",{"key":24,"text":196,"correct":22},"粗格栅栅渣宜采用螺旋输送机输送",{"key":27,"text":198,"correct":32},"细格栅、粗格栅栅渣宜分别采用螺旋输送机、带式输送机输送",{"key":30,"text":200,"correct":22},"细格栅、粗格栅的栅渣可采用任意方式输送",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":30,"analysis":33},879301,"当减少截流式合流制溢流混合污水对水体的污染，可对溢流的混合污水进行适当的处理，下面哪种处理方法是不恰当的？( )",[205,207,209,211],{"key":20,"text":206,"correct":22},"对溢流的混合污水进行储存，晴天时抽至污水处理厂处理后排放",{"key":24,"text":208,"correct":22},"对溢流的混合污水进行“细筛滤—沉淀—消毒”处理后排放",{"key":27,"text":210,"correct":22},"对溢流的混合污水进行“细筛滤—沉淀—人工湿地处理”后排放",{"key":30,"text":212,"correct":32},"在降雨量较大的地区，为了控制溢流的混合污水对水体的污染，应修建大型污水厂，对所有污水和雨水进行处理",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},879302,"下列哪条因素与污水处理系统格栅的过栅水头损失计算无关？( )",[217,219,221,223],{"key":20,"text":218,"correct":22},"格栅设置倾角",{"key":24,"text":220,"correct":22},"过栅流速",{"key":27,"text":222,"correct":22},"栅条断面形状",{"key":30,"text":224,"correct":32},"栅前水深",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},879303,"以下关于排水工程规划设计的叙述中，哪项错误？( )",[229,231,233,235],{"key":20,"text":230,"correct":22},"排水工程规划设计是在区域规划以及各城市和工业企业的总体规划基础上进行",{"key":24,"text":232,"correct":22},"排水工程规划设计排水管道系统和污水处理厂的规划设计",{"key":27,"text":234,"correct":22},"排水工程规划设计要与邻近区域内的污水和污泥的处理处置系统相协调",{"key":30,"text":236,"correct":32},"排水工程规划设计要处理好污染物分散治理和集中处理的关系，城市污水必须进行集中处理",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":30,"analysis":33},879304,"在排水工程设计中，下列说法哪项正确？( )",[241,243,245,247],{"key":20,"text":242,"correct":22},"在污水排水区域内，对管道系统的污水收集量起控制作用的地点为控制点",{"key":24,"text":244,"correct":22},"当管道埋设深度大于4m时，需设中途泵站提高下游管道的高程",{"key":27,"text":246,"correct":22},"道路红线宽度超过30m的城市干道，宜在道路两侧布置排水管道",{"key":30,"text":248,"correct":32},"当排水管从平坦地区敷设至陡坡地区且下游管径小于上游管径时，应采取管底平接",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},879305,"某市政污水处理厂采用传统活性污泥处理工艺，曝气池出口处混合液经过30min静沉后，沉降比为60%，SVI为200。关于该曝气池内活性污泥性能的判断，最恰当的是下列哪项？( )",[253,255,257,259],{"key":20,"text":254,"correct":22},"污泥中无机物含量太高",{"key":24,"text":256,"correct":22},"污泥已解体",{"key":27,"text":258,"correct":22},"污泥沉降性性能良好",{"key":30,"text":260,"correct":32},"污泥沉降性能不好",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},879306,"进行雨水管渠设计计算时，降雨量、降雨历时、暴雨强度等是雨量分析的主要因素，则下列说法中，哪项不正确？( )",[265,267,269,271],{"key":20,"text":266,"correct":32},"降雨量是指降雨的绝对量，单位以mm表示。在研究降雨量时，常以单位时间表示，因此，降雨量的单位可用“mm\u002F单位时间”来表示",{"key":24,"text":268,"correct":22},"降雨历时是指连续降雨时间段，可以指一场雨全部降雨时间，也可以指其中个别的连续时间段",{"key":27,"text":270,"correct":22},"暴雨强度是指某一连续降雨时间段内的平均降雨量，在工程上常用单位时间单位面积上降雨的体积表示",{"key":30,"text":272,"correct":22},"降雨虽然是非均匀分布的，但在工程应用中，在小汇水面积上可以不考虑降雨在面积上的不均匀性",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},879307,"下列关于污水泵站设计的说法中，哪项错误？( )",[277,279,281,283],{"key":20,"text":278,"correct":22},"当2台或2台以上污水泵合用一根出水管时，每台水泵出水管上均应设置止回阀和闸门",{"key":24,"text":280,"correct":22},"污水泵站集水池前应设闸门",{"key":27,"text":282,"correct":32},"污水泵站室外地坪标高应按20年一遇洪水设计",{"key":30,"text":284,"correct":22},"污水泵站水泵布置宜采用单行排列",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":30,"analysis":33},879308,"某排水工程先用大口径钢筋混凝土管穿越一段淤泥地段，选用哪种基础才能保证管道接口安全？( )",[289,291,293,295],{"key":20,"text":290,"correct":22},"素土基础",{"key":24,"text":292,"correct":22},"砂垫层基础",{"key":27,"text":294,"correct":22},"混凝土枕基",{"key":30,"text":296,"correct":32},"混凝土带形基础",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},879309,"雨水管道设计时，为了提高管道排水安全性，应采取以下哪种措施？( )",[301,303,305,307],{"key":20,"text":302,"correct":22},"延长地面集流时间",{"key":24,"text":304,"correct":32},"提高重现期",{"key":27,"text":306,"correct":22},"减小管道内水的流速",{"key":30,"text":308,"correct":22},"减小径流系数",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":30,"analysis":33},879310,"下列哪种生物膜工艺后可不设二沉池？( )",[313,315,317,319],{"key":20,"text":314,"correct":22},"生物接触氧化法",{"key":24,"text":316,"correct":22},"生物转盘",{"key":27,"text":318,"correct":22},"高负荷生物滤池",{"key":30,"text":320,"correct":32},"曝气生物滤池",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},879311,"分流制城镇污水管道系统服务对象为下述哪项？( )",[325,327,329,331],{"key":20,"text":326,"correct":32},"城镇生活污水及工业废水",{"key":24,"text":328,"correct":22},"建筑中水",{"key":27,"text":330,"correct":22},"再生水",{"key":30,"text":332,"correct":22},"地表初期雨水径流",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":30,"analysis":33},879312,"雨水管渠设计中，对于重现期的叙述正确的是何项？( )",[337,339,341,343],{"key":20,"text":338,"correct":22},"重现期越高，计算所得的暴雨强度越小",{"key":24,"text":340,"correct":22},"重现期取值低，对防止地面积水是有利的",{"key":27,"text":342,"correct":22},"在同一排水系统中，只能采用同一重现期",{"key":30,"text":344,"correct":32},"暴雨强度随着设计重现期的增高而加大",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":27,"analysis":33},879313,"关于“吸附—再生”活性污泥处理系统，下面哪种论述是错误的？( )",[349,351,353,355],{"key":20,"text":350,"correct":22},"“吸附—再生”生物反应池的吸附区和再生区可在一个反应池内，也可分别由两个反应池组成",{"key":24,"text":352,"correct":22},"回流污泥宜先进入再生池后，再进入吸附池",{"key":27,"text":354,"correct":32},"“吸附—再生”活性污泥法宜用于处理溶解性有机物含量较高的污水",{"key":30,"text":356,"correct":22},"再生池中活性污泥微生物进入内源呼吸期",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":30,"analysis":33},879314,"下列关于生物转盘工艺的描述，哪一项是正确的？( )",[361,363,365,367],{"key":20,"text":362,"correct":22},"生物转盘工艺不具有脱氮功能",{"key":24,"text":364,"correct":22},"生物转盘工艺的剩余污泥量大",{"key":27,"text":366,"correct":22},"生物转盘需要驱动力，能耗高",{"key":30,"text":368,"correct":32},"生物转盘不需要曝气和污泥回流，便于维护管理",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":30,"analysis":33},879315,"下列关于雨水管道系统设计的叙述中，哪项正确？( )",[373,375,377,379],{"key":20,"text":374,"correct":22},"设计降雨历时计算采用的折减系数在经济条件较好、安全要求较高的区域可取2",{"key":24,"text":376,"correct":22},"同一雨水系统应采用相同的重现期进行设计",{"key":27,"text":378,"correct":22},"雨水管道应按远期最大日最大时流量进行设计",{"key":30,"text":380,"correct":32},"立体较差道路雨水管道系统设计重现期不小于3年",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},879316,"污水管道的污水设计流量是指以下哪一项？( )",[385,387,389,391],{"key":20,"text":386,"correct":32},"污水管道及其附属构筑物能保证通过的污水最大流量",{"key":24,"text":388,"correct":22},"城市居民每人每天日常生活中洗涤、冲厕、洗澡等产生的污水量",{"key":27,"text":390,"correct":22},"污水管道及其附属构筑物能保证通过的污水平均流量",{"key":30,"text":392,"correct":22},"城市居民生活污水和公共建筑排水的综合流量",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":395,"answer":27,"analysis":33},879317,[396,398,400,402],{"key":20,"text":397,"correct":22},"重力浓缩池",{"key":24,"text":399,"correct":22},"气浮浓缩池",{"key":27,"text":401,"correct":32},"带式浓缩池",{"key":30,"text":403,"correct":22},"离心式缩池",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":30,"analysis":33},879318,"关于污水处理厂设计，下列哪项说法正确？( )",[408,410,412,414],{"key":20,"text":409,"correct":22},"污水处理厂防洪设计标准宜为二十年一遇洪水位",{"key":24,"text":411,"correct":22},"污水处理厂厂区绿化面积应大于45%",{"key":27,"text":413,"correct":22},"污水处理厂投产运行一年内水量宜达到近期设计规模的60%",{"key":30,"text":415,"correct":32},"污水处理厂与附近居民的卫生防护距离宜大于300m",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":27,"analysis":33},879319,"在计算雨水管渠设计流量时，暴雨强度公式中的降雨历时应为下列何项？( )",[420,422,424,426],{"key":20,"text":421,"correct":22},"设计重现期下，最大一场雨的降雨持续时间",{"key":24,"text":423,"correct":22},"汇水面积最远点的雨水流至管道雨水口的集流时间",{"key":27,"text":425,"correct":32},"汇水面积最远点的雨水流至设计断面的集水时间",{"key":30,"text":427,"correct":22},"雨水从管道起点流到设计断面的流行时间",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":27,"analysis":33},879320,"与好氧生物处理比较，下列关于厌氧生物处理的优点哪一项是不正确的？( )",[432,434,436,438],{"key":20,"text":433,"correct":22},"厌氧法能够实现污泥减量化",{"key":24,"text":435,"correct":22},"厌氧法可将有机物转化为生物能",{"key":27,"text":437,"correct":32},"厌氧法能够承受有毒物质冲击负荷",{"key":30,"text":439,"correct":22},"厌氧法能够处理高浓度有机废水",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},879321,"下列关于合流管道的说法中，哪项正确？( )",[444,446,448,450],{"key":20,"text":445,"correct":22},"合流管道应按非满流设计",{"key":24,"text":447,"correct":22},"合流管道重力流敷设应减小埋深，设置于其他地下管线之上",{"key":27,"text":449,"correct":32},"合流管道应根据需要设通风设施",{"key":30,"text":451,"correct":22},"雨水管道系统与合流制管道系统之间可根据需要设联通管道",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":27,"analysis":33},879322,"下列关于排水管道布置或构筑物设计的说法中，哪项不正确？( )",[456,458,460,462],{"key":20,"text":457,"correct":22},"雨水管道敷设在污水管道之下",{"key":24,"text":459,"correct":22},"污水管道通过宽2m的排洪沟时倒虹管采用一条",{"key":27,"text":461,"correct":32},"立交桥的桥面和地道排水统一收集，设专门泵站排除",{"key":30,"text":463,"correct":22},"在管径大于1000mm的管段，雨水口连接管通过暗井与干管连接",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":30,"analysis":33},879323,"含油废水中油类的存在形式可分为浮油、分散油、乳化油和溶解油四类，按照其油珠粒径由小到大排列的是下列哪一项？( )",[468,470,472,474],{"key":20,"text":469,"correct":22},"分散油、乳化油、溶解油、浮油",{"key":24,"text":471,"correct":22},"溶解油、分散油、乳化油、浮油",{"key":27,"text":473,"correct":22},"乳化油、分散油、溶解油、浮油",{"key":30,"text":475,"correct":32},"溶解油、乳化油、分散油、浮油",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":30,"analysis":33},879324,"污泥厌氧消化池设计中，关于有机物负荷率的概念，下面哪种论述是正确的？( )",[480,482,484,486],{"key":20,"text":481,"correct":22},"消化池单位容积在单位时间内能够接受的新鲜湿污泥总量",{"key":24,"text":483,"correct":22},"消化池单位容积在单位时间内能够接受的新鲜干污泥总量",{"key":27,"text":485,"correct":22},"消化池单位容积在单位时间内能够接受的新鲜污泥中挥发性湿污泥量",{"key":30,"text":487,"correct":32},"消化池单位容积在单位时间内能够接受的新鲜污泥中挥发性干污泥量",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},879325,"关于合流污水泵站的设计，下列哪种说法是正确的？( )",[492,494,496,498],{"key":20,"text":493,"correct":22},"合流污水泵的设计扬程，应根据集水池水位与受纳水体平均水位差确定",{"key":24,"text":495,"correct":32},"合流污水泵站集水池的容积，不应小于最大一台水泵30s的出水量",{"key":27,"text":497,"correct":22},"合流污水泵站集水池设计最高水位应低于进水管管顶",{"key":30,"text":499,"correct":22},"合流污水泵站应采用非自灌式",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},879326,"某城镇沿河岸山地建设，城市用地以10‰～20‰的坡度坡向河流。你认为该城镇污水排水干管、主干管采用以下哪种平面布置形式最合理？( )",[504,506,508,510],{"key":20,"text":505,"correct":22},"直流正交式",{"key":24,"text":507,"correct":22},"分区式",{"key":27,"text":509,"correct":32},"平行式",{"key":30,"text":511,"correct":22},"截流式",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":30,"analysis":33},879327,"下述哪种情况不宜采用柔性接口？( )",[516,518,520,522],{"key":20,"text":517,"correct":22},"在地震设防烈度为8度地区敷设的管道",{"key":24,"text":519,"correct":22},"污水及合流制管道",{"key":27,"text":521,"correct":22},"穿过细砂层并在最高地下水位以下敷设的管道",{"key":30,"text":523,"correct":32},"设有带形基础的无压管道",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},879328,"下列哪种溶气气浮方式能耗低且较常使用？( )",[528,530,532,534],{"key":20,"text":529,"correct":32},"水泵空压机溶气",{"key":24,"text":531,"correct":22},"水泵吸水管吸气溶气",{"key":27,"text":533,"correct":22},"水泵出水管射流溶气",{"key":30,"text":535,"correct":22},"内循环式射流加压溶气",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},879329,"某城镇污水厂进水凯氏氮浓度为54mg\u002FL，氨氮浓度32mg\u002FL，硝酸盐和亚硝酸盐浓度分别为1.5mg\u002FL和0.5mg\u002FL，该污水总氮浓度应为下列哪项？( )",[540,542,544,546],{"key":20,"text":541,"correct":22},"34mg\u002FL",{"key":24,"text":543,"correct":32},"56mg\u002FL",{"key":27,"text":545,"correct":22},"88mg\u002FL",{"key":30,"text":547,"correct":22},"52mg\u002FL",{"id":549,"libraryId":5,"type":550,"typeLabel":551,"stem":552,"options":553,"answer":562,"analysis":33},879330,2,"多选题","下列关于提高悬浮颗粒在理想沉淀池中去除效率方法的叙述中，哪几项不正确？( )",[554,556,558,560],{"key":20,"text":555,"correct":32},"促使颗粒相互聚结增大颗粒粒径，有助于提高去除率",{"key":24,"text":557,"correct":22},"增大沉淀面积减少表面负荷，有助于提高去除率",{"key":27,"text":559,"correct":32},"增大沉淀池长宽比，增大水平流速，有助于提高去除率",{"key":30,"text":561,"correct":32},"增大沉淀池水深，增加沉淀时间，有助于提高去除效率","ACD",{"id":564,"libraryId":5,"type":550,"typeLabel":551,"stem":565,"options":566,"answer":562,"analysis":33},879331,"下列关于水中胶体颗粒稳定性叙述中，正确的是哪几项？( )",[567,569,571,573],{"key":20,"text":568,"correct":32},"水分子及其他杂质分子、离子的布朗运动是胶体颗粒动力学稳定性因素又是引起胶体颗粒聚结的不稳定性因素",{"key":24,"text":570,"correct":22},"胶体表面扩散层中反离子化合价越低，两颗粒间的斥力作用越小，越容易相互聚结",{"key":27,"text":572,"correct":32},"胶体颗粒之间的电斥力作用是憎水胶体颗粒聚集稳定性的主要原因",{"key":30,"text":574,"correct":32},"胶体颗粒之间的水化膜作用是亲水胶体聚集稳定性的原因之一",{"id":576,"libraryId":5,"type":550,"typeLabel":551,"stem":577,"options":578,"answer":587,"analysis":33},879332,"在选择管道经济管径时，以下说法哪些是错误的？( )",[579,581,583,585],{"key":20,"text":580,"correct":32},"电费越贵，经济管径越小",{"key":24,"text":582,"correct":22},"管道造价越贵，经济管径越小",{"key":27,"text":584,"correct":32},"投资偿还期越长.经济管径越小",{"key":30,"text":586,"correct":22},"管道大修费率越高，经济管径越小","AC",{"id":589,"libraryId":5,"type":550,"typeLabel":551,"stem":590,"options":591,"answer":600,"analysis":33},879333,"下列选择地表水取水口位置的要求中，哪几项可避免泥砂淤积的影响？( )",[592,594,596,598],{"key":20,"text":593,"correct":22},"取水口应在污水排放口上游100～150m以上处",{"key":24,"text":595,"correct":32},"取水口应离开支流出口处上下游有足够的距离",{"key":27,"text":597,"correct":32},"取水口一般设在桥前500～1000mm以外的地方",{"key":30,"text":599,"correct":32},"取水口设在突出河岸的码头附近时，应离开码头一定距离","BCD",{"id":602,"libraryId":5,"type":550,"typeLabel":551,"stem":603,"options":604,"answer":613,"analysis":33},879334,"下列关于反渗透膜的叙述中，哪几项不正确？( )",[605,607,609,611],{"key":20,"text":606,"correct":22},"实际运行时的工作压力大于理论计算值",{"key":24,"text":608,"correct":32},"经过了两级反渗透膜过滤的出水可满足高纯水的要求",{"key":27,"text":610,"correct":32},"水分子之所以通过半透膜向咸水一侧自然渗透，是因为纯水的化学位低于咸水",{"key":30,"text":612,"correct":22},"海水淡化和自来水除盐采用的操作压力是不同的","BC",{"id":615,"libraryId":5,"type":550,"typeLabel":551,"stem":616,"options":617,"answer":626,"analysis":33},879335,"下列关于澄清池澄清原理的叙述中，哪几项正确？( )",[618,620,622,624],{"key":20,"text":619,"correct":22},"泥渣循环型澄清池主要依靠泥渣循环过程中离心作用使悬浮颗粒从水中分离出来",{"key":24,"text":621,"correct":32},"泥渣悬浮型澄清池主要依靠悬浮泥渣层吸附、拦截进水中的悬浮颗粒从水中分离出来",{"key":27,"text":623,"correct":22},"泥渣循环型澄清池分离室下部的悬浮泥渣层浓度、厚度和澄清池回流泥量有关",{"key":30,"text":625,"correct":32},"泥渣悬浮型澄清池中悬浮泥渣层浓度、厚度和上升水流的速度有关","BD",[628,631,634,637,640,643],{"id":15,"name":629,"category":7,"favorite":630},"领导干部任职前廉政法规知识测试题",92,{"id":632,"name":633,"category":7,"favorite":15},595,"建筑结构与设备",{"id":635,"name":636,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":638,"name":639,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":641,"name":642,"category":7,"favorite":8},534,"BIM工程师",{"id":644,"name":642,"category":7,"favorite":8},535]