[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-878996":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},878996,568,1,"单选题","以下有关雨水溢流设施的设置要求中，何项是正确的？( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建筑采用压力流雨水排水系统时，应设置屋面雨水溢流设施",true,{"key":16,"text":17,"correct":18},"B","重要公共建筑压力流雨水排水系统与溢流设施的排水量之和不应小于10年重现期的雨水量",false,{"key":20,"text":21,"correct":18},"C","建筑采用重力流雨水排水系统且各汇水面积内设有两根或两根以上排水立管时，可不设雨水溢流设施",{"key":23,"text":24,"correct":18},"D","建筑采用重力流雨水排水系统各汇水面积内仅有一根排水立管时，应设雨水溢流设施，其排水量等同于雨水立管的设计流量","",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（给排水）","建筑工程",0]