[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-878837":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},878837,568,1,"单选题","下列有关输水干管设计的叙述中，哪项正确？( )",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","输水干管必须设计两根及两根以上",false,{"key":16,"text":17,"correct":14},"B","输水干管发生事故时，该干管必须满足设计水量的70%",{"key":19,"text":20,"correct":21},"C","两条输水干管连通管越多，事故时供水保证率越高",true,{"key":23,"text":24,"correct":14},"D","重力输水的输水管穿越河道必须采用从河底穿越方式","参见《室外给水设计规范》第7.1.3条，输水干管不宜少于两条，当有安全贮水池或其他安全供水措施时，也可修建一条，故A错误。根据规范，对于城镇供水，事故保证率为70%，但对于工业用水，事故保证率应根据工业企业的性质决定，故B错误。规范7.3.8条，穿越河道还可采用管桥方法，故D错误。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（给排水）","建筑工程",0]