[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-878795":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},878795,568,1,"单选题","下列有关输水管设计流量的叙述中，哪项正确？( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","从净水厂至城市管网的清水输水管设计流量等于最高日最大时供水量和输水干管漏损水量之和",false,{"key":16,"text":17,"correct":18},"B","从水源至净水厂的原水输水管设计流量等于水处理构筑物设计水量和原水输水管漏损水量之和",true,{"key":20,"text":21,"correct":14},"C","从净水厂至城市管网中高位水池的清水输水管设计流量等于向高位水池输水流量和高位水池向管网供水量之和",{"key":23,"text":24,"correct":14},"D","从水厂滤池至清水池的输水管设计流量等于最高日最大时供水量和水厂自用水量之和","选项A错误，不应计入输水干管漏损水量。选项C错误，管网内设水塔(高位水池)，清水输水管流量按水塔设置位置不同，设计流量不同，但皆与C项表达不同。选项D错误，应为最高日(平均时)供水量和水厂自用水量之和。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（给排水）","建筑工程",0]