[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-878675":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},878675,568,1,"单选题","供水管网中，管段的设计计算流量为下列哪项？( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","管段的沿线流量和转输流量",false,{"key":16,"text":17,"correct":14},"B","管段的转输流量",{"key":19,"text":20,"correct":14},"C","管段的沿线流量",{"key":22,"text":23,"correct":24},"D","管段的转输流量和50%的沿线流量",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（给排水）","建筑工程",0]