[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-878642":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},878642,568,1,"单选题","某城镇自来水厂在流经城区的一条流向单一的较宽通航河道上已建有河床式取水构筑物。现因城镇发展需要，拟在河道上新建桥梁、码头。在征询水厂对新建构筑物位置的意见时，水厂提出的下列意见和要求中，哪项是不合适的？( )",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","桥梁可建在距现有取水构筑物上游1000m及以远处",false,{"key":16,"text":17,"correct":14},"B","桥梁可建在距现有取水构筑物下游500m及以远处",{"key":19,"text":20,"correct":21},"C","码头可建在现有取水构筑物附近同岸上游",true,{"key":23,"text":24,"correct":14},"D","码头可建在现有取水构筑物对岸","码头建在取水构筑物附近同岸上游，则意味着取水构筑物建在码头同岸下游，码头与丁坝类似，这是不适宜的。A项、B项虽然说法上与教材内容有点颠倒，但本质上无错。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（给排水）","建筑工程",0]