[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-878638":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},878638,568,1,"单选题","为了保证输水管道在各种设计工况下运行时，管道不出现负压，下列哪项措施正确？( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","应提高输水管道的输水压力",true,{"key":16,"text":17,"correct":18},"B","应增大输水管道的管径",false,{"key":20,"text":21,"correct":18},"C","应缩短输水管道的长度",{"key":23,"text":24,"correct":18},"D","输水管道埋设在水力坡度线以上","选项B中，重力供水时若可用水头恒定，增大管径时将导致流量增大，若考虑增大管径来降低水头损失，可能导致管道流速过小；选项C中，输水起、终点确定后，最小管道长度确定；选项D中，输水管埋设在水力坡度线之上的话，则任意点均存在其管道标高大于水压标高，即Z＞Z+P，这样必然导致负压。故B、C、D错误。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（给排水）","建筑工程",0]