[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-878182":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},878182,567,1,"单选题","以下关于支架荷载的计算方法不正确的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","作用在一个支架上的总垂直荷载等于1.5倍作用在一个支架上的基本荷载",false,{"key":16,"text":17,"correct":14},"B","当固定支架布置在带有弯管段上或者在装有阀门或堵板的管段上时，内推压力为介质工作压力与套管补偿器的套筒外径横截面积之积",{"key":19,"text":20,"correct":14},"C","热位移向下的弹簧支吊架的垂直荷载取1.2倍弹簧的安装荷载和1.5倍基本荷载中的较大值",{"key":22,"text":23,"correct":24},"D","热位移向下的弹簧支吊架的垂直荷载1.2倍基本荷载",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（动力专业）","建筑工程",0]