[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-877877":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},877877,567,1,"单选题","热水热力网支干线、支线应按允许压力降确定管径，以下说法错误的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","支干线、支线供热介质流速不应大于3.5m／s",false,{"key":16,"text":17,"correct":14},"B","支干线比摩阻不应大于300Pa／m",{"key":19,"text":20,"correct":14},"C","连接一个热力站的支线比摩阻可大于300Pa／m",{"key":22,"text":23,"correct":24},"D","连接一个热力站的支线比摩阻可大于400Pa／m",true,"",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（动力专业）","建筑工程",0]