[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-876713":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},876713,565,1,"单选题","由暴雨推求设计洪水的以下四个步骤中，哪个是不必要的？( )",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","对暴雨资料进行收集、审查与延长(若暴雨系列不够长)",false,{"key":16,"text":17,"correct":14},"B","由点暴雨量推求流域设计面暴雨量，并对设计暴雨进行时程分配",{"key":19,"text":20,"correct":21},"C","对设计暴雨进行频率分析，求到设定频率下的暴雨过程",true,{"key":23,"text":24,"correct":14},"D","由设计暴雨过程推求设计净雨过程，再进行汇流计算得到设计洪水","",{"id":6,"name":27,"category":28,"favorite":29},"专业基础知识（给排水）","建筑工程",0]