[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-876111":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},876111,565,1,"单选题","",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","点A和点B",false,{"key":16,"text":17,"correct":18},"B","点A和点C",true,{"key":20,"text":21,"correct":14},"C","点A和点D",{"key":23,"text":24,"correct":14},"D","点B和点D","图中，点A为实际需求工况点，点B为在实际需求出水量下水泵的工况点，点C为通过点A的等效率曲线(即切削抛物线)与水泵特性曲线的交点，点D为水泵特性曲线、管道系统特性曲线的交点，为不采取调节措施时的工况点。换轮调节的叶轮切削量需根据工况点A的实际需求应用切削律确定，在等效率曲线上的点符合切削律，故可针对点A和点C应用切削律，以确定对应于点A的叶轮直径，进而计算叶轮切削量。",{"id":6,"name":27,"category":28,"favorite":29},"专业基础知识（给排水）","建筑工程",0]