[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-564-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":549},{"id":5,"name":6,"category":7,"favorite":8},564,"专业案例（暖通空调专业）","建筑工程",0,1,50,477,[13,32,39,50,62,74,81,93,104,116,128,139,146,158,165,177,189,200,207,219,231,238,246,257,268,275,287,298,310,322,334,346,357,368,376,383,395,407,414,426,438,449,460,472,483,495,507,518,529,540],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":16},875463,"单选题","",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","≤44W／㎡",false,{"key":23,"text":24,"correct":21},"B","≤45W／㎡",{"key":26,"text":27,"correct":28},"C","≤46W\u002F㎡",true,{"key":30,"text":31,"correct":21},"D","≤47W／㎡",{"id":33,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":34,"answer":23,"analysis":16},875464,[35,36,37,38],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":28},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":21},{"id":40,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":41,"answer":26,"analysis":16},875465,[42,44,46,48],{"key":19,"text":43,"correct":21},"10.4℃",{"key":23,"text":45,"correct":21},"12.4℃",{"key":26,"text":47,"correct":28},"14.4℃",{"key":30,"text":49,"correct":21},"15.4℃",{"id":51,"libraryId":5,"type":9,"typeLabel":15,"stem":52,"options":53,"answer":26,"analysis":16},875466,"某洁净室面积80㎡，洁净度测定的测点个数应为( )。",[54,56,58,60],{"key":19,"text":55,"correct":21},"3个",{"key":23,"text":57,"correct":21},"6个",{"key":26,"text":59,"correct":28},"9个",{"key":30,"text":61,"correct":21},"12个",{"id":63,"libraryId":5,"type":9,"typeLabel":15,"stem":64,"options":65,"answer":26,"analysis":16},875467,"某小区供暖热负荷为1200kW，供暖一次热水由市政热力管网提供，供回水温度为110℃\u002F70℃，采用水一水换热器进行换热后为小区供暖，换热器的传热系数为2500W\u002F(㎡·K)，供暖供回水温度为80℃\u002F60℃，水垢系数b=0.75。该换热器的换热面积应是下列哪一项？( )",[66,68,70,72],{"key":19,"text":67,"correct":21},"16～22㎡",{"key":23,"text":69,"correct":21},"24～30㎡",{"key":26,"text":71,"correct":28},"32～38㎡",{"key":30,"text":73,"correct":21},"40～46㎡",{"id":75,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":76,"answer":23,"analysis":16},875468,[77,78,79,80],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":28},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":21},{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":30,"analysis":16},875469,"全新风热风供暖车间供暖设计热负荷为200kW，室内设计温度为15℃，供暖室外计算温度为-8℃，通风室外计算温度为-5℃，送风量为10kg\u002Fs，空气加热器使用的热媒为城市热网110℃\u002F70℃的热水，空气加热器的传热系数为40W\u002F(㎡·K)，考虑安全系数后，空气加热器所需加热面积应为( )。",[85,87,89,91],{"key":19,"text":86,"correct":21},"100～120㎡",{"key":23,"text":88,"correct":21},"121～140㎡",{"key":26,"text":90,"correct":21},"141～160㎡",{"key":30,"text":92,"correct":28},"161～190㎡",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":95,"answer":30,"analysis":16},875470,[96,98,100,102],{"key":19,"text":97,"correct":21},"20kW",{"key":23,"text":99,"correct":21},"24kW",{"key":26,"text":101,"correct":21},"28.2kW",{"key":30,"text":103,"correct":28},"32.4kW",{"id":105,"libraryId":5,"type":9,"typeLabel":15,"stem":106,"options":107,"answer":26,"analysis":16},875471,"北京市一栋办公楼，体形系数小于0.3，外墙为240mm钢筋混凝土，采用聚苯保温板保温，内表面传热系数为8.7W\u002F(㎡·K)，外表面传热系数为23W\u002F(㎡·K)，钢筋混凝土的导热系数为1.74W\u002F(m·K)，聚苯保温板的导热系数为0.047W\u002F(m·K)，保温层的最小厚度为( )。",[108,110,112,114],{"key":19,"text":109,"correct":21},"95mm",{"key":23,"text":111,"correct":21},"85mm",{"key":26,"text":113,"correct":28},"65mm",{"key":30,"text":115,"correct":21},"45mm",{"id":117,"libraryId":5,"type":9,"typeLabel":15,"stem":118,"options":119,"answer":26,"analysis":16},875472,"已知氨水中氨的质量分数为25%，氨的摩尔分数和比摩尔分数分别为( )。",[120,122,124,126],{"key":19,"text":121,"correct":21},"0.352，0.26",{"key":23,"text":123,"correct":21},"O.236，0.32",{"key":26,"text":125,"correct":28},"O.26，0.352",{"key":30,"text":127,"correct":21},"O.32，0.236",{"id":129,"libraryId":5,"type":9,"typeLabel":15,"stem":130,"options":131,"answer":30,"analysis":16},875473,"某公共建筑的集中热水供暖二次水系统，供暖负荷为3000kW，设计供回水温差△t=25℃，室外供回水主干线长度∑L=1400m，循环水泵采用联轴器连接，循环水泵在设计工况点的轴功率应不大于( )。",[132,133,135,137],{"key":19,"text":97,"correct":21},{"key":23,"text":134,"correct":21},"18kW",{"key":26,"text":136,"correct":21},"16kW",{"key":30,"text":138,"correct":28},"14kW",{"id":140,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":141,"answer":30,"analysis":16},875474,[142,143,144,145],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":28},{"id":147,"libraryId":5,"type":9,"typeLabel":15,"stem":148,"options":149,"answer":30,"analysis":16},875475,"某新建化验室排放有害气体苯，其排气筒的高度为12m，其符合国家二级排放标准的最高允许速率应是下列哪一项？( )",[150,152,154,156],{"key":19,"text":151,"correct":21},"约0.78kg\u002Fh",{"key":23,"text":153,"correct":21},"约0.5kg\u002Fh",{"key":26,"text":155,"correct":21},"约0.4kg\u002Fh",{"key":30,"text":157,"correct":28},"约0.16kg\u002Fh",{"id":159,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":160,"answer":30,"analysis":16},875476,[161,162,163,164],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":28},{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":19,"analysis":16},875477,"某机械循环热水供暖系统包括南北两个并联循环环路1和2，系统设计供／回水温度为95\u002F70℃，总热负荷为74800W，水力计算环路1的压力损失为4513Pa，流量为1196kg\u002Fh，环路2的压力损失为4100Pa，流量为1180kg\u002Fh，如果采用不等温降方法进行水力计算，环路1最远立管温降30℃，则实际温降为多少？( )。",[169,171,173,175],{"key":19,"text":170,"correct":28},"28.4℃",{"key":23,"text":172,"correct":21},"30℃",{"key":26,"text":174,"correct":21},"25℃",{"key":30,"text":176,"correct":21},"31.7℃",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":30,"analysis":16},875478,"某房间面积为20㎡，高为2.8m，室内温度为20℃，相对湿度为50%。1次换气通风，散热器热量为Q，采用喷雾加湿，室外温度为-6℃，相对湿度为50%，则加湿量和热量Q的变化为( )。",[181,183,185,187],{"key":19,"text":182,"correct":21},"200～220kg\u002Fh，Q不变",{"key":23,"text":184,"correct":21},"400～420kg\u002Fh，Q不变",{"key":26,"text":186,"correct":21},"200～220kg／h，Q变大",{"key":30,"text":188,"correct":28},"400～420kg\u002Fh，Q变大",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":191,"answer":30,"analysis":16},875479,[192,194,196,198],{"key":19,"text":193,"correct":21},"3500～4000kW",{"key":23,"text":195,"correct":21},"3000～3500kW",{"key":26,"text":197,"correct":21},"2500～3000kW",{"key":30,"text":199,"correct":28},"2000～2500kW",{"id":201,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":202,"answer":30,"analysis":16},875480,[203,204,205,206],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":28},{"id":208,"libraryId":5,"type":9,"typeLabel":15,"stem":209,"options":210,"answer":19,"analysis":16},875481,"南方某办公建筑拟设蓄冰空调，该大楼设计日的总负荷为12045kW·h，当地电费的谷价时段为23：00-07：00，采用双工况螺杆式制冷机夜间低谷电价时段制冰蓄冷(制冰时制冷能力的变化率为0.7)，白天机组在空调工况运行9h，制冷站设计日附加系数为1.0，试问：在部分负荷蓄冷的条件下，该项目蓄冷装置最低有效容量Q。应为( )。",[211,213,215,217],{"key":19,"text":212,"correct":28},"4450～4650kW",{"key":23,"text":214,"correct":21},"4700～4850kW",{"key":26,"text":216,"correct":21},"4950～5150kW",{"key":30,"text":218,"correct":21},"5250～5450kW",{"id":220,"libraryId":5,"type":9,"typeLabel":15,"stem":221,"options":222,"answer":30,"analysis":16},875482,"某两级除尘器系统，已知粉尘的初始浓度为15g\u002Fm3，排风标准为30mg\u002Fm3，第一级除尘器效率85%，求第二级除尘器的效率至少应为下列哪一项？",[223,225,227,229],{"key":19,"text":224,"correct":21},"82.5%～85%",{"key":23,"text":226,"correct":21},"86.5%～90%",{"key":26,"text":228,"correct":21},"91.5%～95.5%",{"key":30,"text":230,"correct":28},"96.5%～99.5%",{"id":232,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":233,"answer":30,"analysis":16},875483,[234,235,236,237],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":28},{"id":239,"libraryId":5,"type":9,"typeLabel":15,"stem":240,"options":241,"answer":19,"analysis":16},875484,"有一台制冷剂为R717的8缸活塞压缩机，缸径为100mm，活塞行程为80mm，压缩机转速为720r／min，压缩比为6，压缩机的实际输气量是下列何项？( )。",[242,243,244,245],{"key":19,"text":16,"correct":28},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":21},{"id":247,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":248,"answer":23,"analysis":16},875485,[249,251,253,255],{"key":19,"text":250,"correct":21},"80Pa",{"key":23,"text":252,"correct":28},"90Pa",{"key":26,"text":254,"correct":21},"100Pa",{"key":30,"text":256,"correct":21},"110Pa",{"id":258,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":259,"answer":26,"analysis":16},875486,[260,262,264,266],{"key":19,"text":261,"correct":21},"1.275～1.285",{"key":23,"text":263,"correct":21},"1.286～1.300",{"key":26,"text":265,"correct":28},"1.350～1.370",{"key":30,"text":267,"correct":21},"1.371～1.380",{"id":269,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":270,"answer":26,"analysis":16},875487,[271,272,273,274],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":28},{"key":30,"text":16,"correct":21},{"id":276,"libraryId":5,"type":9,"typeLabel":15,"stem":277,"options":278,"answer":26,"analysis":16},875488,"某市一装配式冷库用于贮藏冻肉。装配式冷库的库板为1mm厚压花铝板夹150mm厚聚氨酯隔热层。导热系数，铝板为202.940W\u002F(m·℃)，聚氨酯隔热材料为0.031W\u002F(m·℃)。蓄热系数，铝板为182.59W\u002F(㎡·℃)，聚氨酯隔热材料为0.28W\u002F(㎡·℃)。冷藏间设计温度-18℃。该市夏季通风室外计算干球温度为33℃；夏季空调室外计算干球温度为36.5℃；夏季空调日平均温度为32.5℃。围护结构高温侧空气露点温度为27.41℃。围护结构外表面热阻为0.043㎡·℃\u002FW。热阻修正系数为b，当围护结构热惰性指标D≤4时，b=1.2；其他围护结构，b=1.0。则该装配式冷库围护结构的最小总热阻是( )。",[279,281,283,285],{"key":19,"text":280,"correct":21},"0.30～0.35㎡·℃\u002FW",{"key":23,"text":282,"correct":21},"0.46～0.50㎡·℃\u002FW",{"key":26,"text":284,"correct":28},"0.51～0.55㎡·℃\u002FW",{"key":30,"text":286,"correct":21},"0.40～0.45㎡·℃\u002FW",{"id":288,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":289,"answer":23,"analysis":16},875489,[290,292,294,296],{"key":19,"text":291,"correct":21},"10～20W",{"key":23,"text":293,"correct":28},"30～40W",{"key":26,"text":295,"correct":21},"50～60W",{"key":30,"text":297,"correct":21},"80～90W",{"id":299,"libraryId":5,"type":9,"typeLabel":15,"stem":300,"options":301,"answer":19,"analysis":16},875490,"某商住楼，每层建筑面积960㎡，首层和2层是商场，供暖室内计算温度18℃，3层及以上是住宅，每层8户，供暖室内计算温度20℃，每户住宅计算供暖负荷约为5kW。2，3层之间的楼板传热系数为2.0W\u002F(㎡·K)。对“相邻房间传热”的处理，下列哪一种是正确的？( )",[302,304,306,308],{"key":19,"text":303,"correct":28},"不需要计算2，3层之间的传热量",{"key":23,"text":305,"correct":21},"计算3层向2层的传热量，作为3层房间的供暖负荷",{"key":26,"text":307,"correct":21},"计算3层向2层的传热量，增加3层房间的供暖负荷和减少2层房间的供暖负荷",{"key":30,"text":309,"correct":21},"2，3层之间的楼板增加保温层，降低楼板的传热系数",{"id":311,"libraryId":5,"type":9,"typeLabel":15,"stem":312,"options":313,"answer":26,"analysis":16},875491,"某住宅楼16层、每层6户，每户卫生器具为低水箱冲落式坐便器、淋浴器、洗涤盆、洗脸盆、家用洗衣机各一个，排水共用一个出口，其排水设计秒流量为下列哪一项？( )",[314,316,318,320],{"key":19,"text":315,"correct":21},"4.5～5.4L\u002Fs",{"key":23,"text":317,"correct":21},"5.5～6.4L\u002Fs",{"key":26,"text":319,"correct":28},"6.5～7.4L\u002Fs",{"key":30,"text":321,"correct":21},"7.5～8.5L\u002Fs",{"id":323,"libraryId":5,"type":9,"typeLabel":15,"stem":324,"options":325,"answer":26,"analysis":16},875492,"哈尔滨市某5层居住建筑的外墙由150mm厚加气混凝土、20mm厚抹灰、50mm厚双面铝箔封闭空气间层及聚苯板组成。加气混凝土的导热系数为0.28W\u002F(m·K)，抹灰的导热系数为0.87W\u002F(m·K)，聚苯板的导热系数为0.03W\u002F(m·K)。聚苯板的最小厚度应为( )。",[326,328,330,332],{"key":19,"text":327,"correct":21},"2.0～2.4cm",{"key":23,"text":329,"correct":21},"3.2～3.3cm",{"key":26,"text":331,"correct":28},"3.5～3.9cm",{"key":30,"text":333,"correct":21},"8.0～8.4cm",{"id":335,"libraryId":5,"type":9,"typeLabel":15,"stem":336,"options":337,"answer":23,"analysis":16},875493,"某燃煤锅炉房有下列负荷(已经计入输送热损失)：1)散热器供暖系统(95℃\u002F70℃热水)4MW；2)地板辐射供暖系统(50℃\u002F40℃热水)4MW；3)空调系统(60℃\u002F50℃热水)8MW；4)集中生活热水系统及游泳池水加热夏季的最小负荷(0.5MPa蒸汽)2.5MW；5)空调加湿(0.2MPa蒸汽)1800kg\u002Fh。该锅炉房最小的1台蒸汽锅炉蒸发量应该不大于( )。",[338,340,342,344],{"key":19,"text":339,"correct":21},"4t\u002Fh",{"key":23,"text":341,"correct":28},"6t\u002Fh",{"key":26,"text":343,"correct":21},"8t\u002Fh",{"key":30,"text":345,"correct":21},"10t\u002Fh",{"id":347,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":348,"answer":26,"analysis":16},875494,[349,351,353,355],{"key":19,"text":350,"correct":21},"W=3.84kg\u002Fh，Q=1.95kW",{"key":23,"text":352,"correct":21},"W=6.95kg\u002Fh，Q=2.95kW",{"key":26,"text":354,"correct":28},"W=3.84kg\u002Fh，Q=5.71kW",{"key":30,"text":356,"correct":21},"W=6.95kg\u002Fh，Q=5.71kW",{"id":358,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":359,"answer":23,"analysis":16},875495,[360,362,364,366],{"key":19,"text":361,"correct":21},"95000～100000W",{"key":23,"text":363,"correct":28},"85000～88000W",{"key":26,"text":365,"correct":21},"82000～84000W",{"key":30,"text":367,"correct":21},"79000～81000W",{"id":369,"libraryId":5,"type":9,"typeLabel":15,"stem":370,"options":371,"answer":23,"analysis":16},875496,"锅炉房控制室长×宽×高为6m×4m×4.5m。值班人数为12人，设计新风系统的最小风量为( )。",[372,373,374,375],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":28},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":21},{"id":377,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":378,"answer":26,"analysis":16},875497,[379,380,381,382],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":28},{"key":30,"text":16,"correct":21},{"id":384,"libraryId":5,"type":9,"typeLabel":15,"stem":385,"options":386,"answer":23,"analysis":16},875498,"某空调冷冻水系统，供回水温度为7\u002F12℃，设计流量G=100m3\u002Fh，水泵扬程H=32m，水泵效率η=0.73，试问该系统的输送能效比(职)为下列何值？",[387,389,391,393],{"key":19,"text":388,"correct":21},"0.0145～0.0155",{"key":23,"text":390,"correct":28},"0.02～0.021",{"key":26,"text":392,"correct":21},"0.022～0.023",{"key":30,"text":394,"correct":21},"0.024～0.025",{"id":396,"libraryId":5,"type":9,"typeLabel":15,"stem":397,"options":398,"answer":30,"analysis":16},875499,"某溴化锂吸收式机组，其发生器出口溶液浓度为57%，吸收器出口溶液浓度为53%，问循环倍率为下列哪一项？( )",[399,401,403,405],{"key":19,"text":400,"correct":21},"13～13.15",{"key":23,"text":402,"correct":21},"13.2～13.3",{"key":26,"text":404,"correct":21},"13.5～14.1",{"key":30,"text":406,"correct":28},"14.2～14.3",{"id":408,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":409,"answer":30,"analysis":16},875500,[410,411,412,413],{"key":19,"text":16,"correct":21},{"key":23,"text":16,"correct":21},{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":28},{"id":415,"libraryId":5,"type":9,"typeLabel":15,"stem":416,"options":417,"answer":23,"analysis":16},875501,"某住宅小区地面标高与锅炉房内循环水泵中心线标高相同，小区中包括3栋8层住宅、2栋6层住宅和1栋16层住宅，各住宅层高均为3m，采用普通铸铁散热器，供暖系统设计供回水温度为95℃\u002F70℃，关于定压点压力和用户连接方式的选择，下列哪个方案最合理？( )",[418,420,422,424],{"key":19,"text":419,"correct":21},"定压点压力取51m，所有用户与热力网直接连接",{"key":23,"text":421,"correct":28},"定压点压力取27m，16层住宅楼与热力网采用分区式连接，高区采用间接连接，低区(1～8层)采用直接连接，其他用户与热力网直接连接",{"key":26,"text":423,"correct":21},"定压点压力取21m，8层住宅楼和16层住宅楼与热力网间接连接，其他用户与热力网直接连接",{"key":30,"text":425,"correct":21},"定压点压力取27m，16层住宅楼与热力网采用分区式连接，高区采用直接连接，低区(1～8层)采用间接连接，其他用户与热力网直接连接",{"id":427,"libraryId":5,"type":9,"typeLabel":15,"stem":428,"options":429,"answer":26,"analysis":16},875502,"假设制冷机组以逆卡诺循环工作，当外界环境温度为35℃，冷水机组可分别制取7℃和18℃冷水，已知室内冷负荷为20kW，可全部采用7℃冷水处理，也可分别用7℃和18℃冷水处理(各承担10kW)，则全部由7℃冷水处理需要的冷机电耗与分别用7℃和18℃的冷水处理需要冷机电耗的比值为( )。",[430,432,434,436],{"key":19,"text":431,"correct":21},"＞2.0",{"key":23,"text":433,"correct":21},"1.6～2.0",{"key":26,"text":435,"correct":28},"1.1～1.5",{"key":30,"text":437,"correct":21},"0.6～1.0",{"id":439,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":440,"answer":19,"analysis":16},875503,[441,443,445,447],{"key":19,"text":442,"correct":28},"16～18",{"key":23,"text":444,"correct":21},"13～15",{"key":26,"text":446,"correct":21},"10～12",{"key":30,"text":448,"correct":21},"7～9",{"id":450,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":451,"answer":23,"analysis":16},875504,[452,454,456,458],{"key":19,"text":453,"correct":21},"8片",{"key":23,"text":455,"correct":28},"9片",{"key":26,"text":457,"correct":21},"10片",{"key":30,"text":459,"correct":21},"11片",{"id":461,"libraryId":5,"type":9,"typeLabel":15,"stem":462,"options":463,"answer":19,"analysis":16},875505,"某建筑物建筑面积为1000㎡，采用直接式太阳能集热系统向房间供暖，建筑物耗热量指标为15W\u002F㎡，太阳能保证率为30%，采光面上的平均太阳辐照量为14，18MJ\u002F(㎡·d)，集热器集热效率为80%，热损失率为10%，集热器面积应为( )。",[464,466,468,470],{"key":19,"text":465,"correct":28},"38～39㎡",{"key":23,"text":467,"correct":21},"39～40㎡",{"key":26,"text":469,"correct":21},"40～41㎡",{"key":30,"text":471,"correct":21},"41～42㎡",{"id":473,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":474,"answer":19,"analysis":16},875506,[475,477,479,481],{"key":19,"text":476,"correct":28},"68～69℃",{"key":23,"text":478,"correct":21},"70～71℃",{"key":26,"text":480,"correct":21},"72～73℃",{"key":30,"text":482,"correct":21},"74～75℃",{"id":484,"libraryId":5,"type":9,"typeLabel":15,"stem":485,"options":486,"answer":30,"analysis":16},875507,"4层建筑，单层层高为4.2m，建筑有中庭64m×18m×16m，则机械排烟风机的排烟量为( )。",[487,489,491,493],{"key":19,"text":488,"correct":21},"69120",{"key":23,"text":490,"correct":21},"73728",{"key":26,"text":492,"correct":21},"102000",{"key":30,"text":494,"correct":28},"112200",{"id":496,"libraryId":5,"type":9,"typeLabel":15,"stem":497,"options":498,"answer":26,"analysis":16},875508,"某房间吊顶中有一段镀锌钢板的空调送风管，其设计空气温度为10℃，设计采用了20mm橡塑海绵保温层，并要求保温材料的导热系数不大于0.03W\u002F(m·K)，运行过程中发现该风管保温层外表面出现了冷凝水，实测风管的环境温度为30℃，相对湿度为75%，与设计工况相同，管内空气温度为8℃，检查发现保温层厚度满足要求，风管内、外表面的表面传热系数分别按25W\u002F(㎡·K)和8W\u002F(㎡·K)计算，计算中风管热阻可以忽略。根据测试结果分析，对结露原因的判断中正确的是( )。",[499,501,503,505],{"key":19,"text":500,"correct":21},"结露是由于设计的保温层厚度太小造成的",{"key":23,"text":502,"correct":21},"结露是由于运行参数不对、送风温度太低造成的",{"key":26,"text":504,"correct":28},"结露是由于材料质量问题造成的",{"key":30,"text":506,"correct":21},"结露是由于综合因素造成的，因此无法准确判断责任方",{"id":508,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":509,"answer":23,"analysis":16},875509,[510,512,514,516],{"key":19,"text":511,"correct":21},"800～900W",{"key":23,"text":513,"correct":28},"900～1000W",{"key":26,"text":515,"correct":21},"1000～1100W",{"key":30,"text":517,"correct":21},"1100～1200W",{"id":519,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":520,"answer":30,"analysis":16},875510,[521,523,525,527],{"key":19,"text":522,"correct":21},"10%～15%",{"key":23,"text":524,"correct":21},"18%～22%",{"key":26,"text":526,"correct":21},"30%～37%",{"key":30,"text":528,"correct":28},"25%～30%",{"id":530,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":531,"answer":26,"analysis":16},875511,[532,534,536,538],{"key":19,"text":533,"correct":21},"23.5%～24.5%",{"key":23,"text":535,"correct":21},"20.5%～21.5%",{"key":26,"text":537,"correct":28},"19.0%～20.0%",{"key":30,"text":539,"correct":21},"17.5%～18.5%",{"id":541,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":542,"answer":30,"analysis":16},875512,[543,545,547,548],{"key":19,"text":544,"correct":21},"采用自然排烟，开窗面积为地板面积的5%",{"key":23,"text":546,"correct":21},"采用自然排烟，开窗面积为地板面积的2%",{"key":26,"text":16,"correct":21},{"key":30,"text":16,"correct":28},[550,553,556,559,562,565],{"id":9,"name":551,"category":7,"favorite":552},"领导干部任职前廉政法规知识测试题",92,{"id":554,"name":555,"category":7,"favorite":9},595,"建筑结构与设备",{"id":557,"name":558,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":560,"name":561,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":563,"name":564,"category":7,"favorite":8},534,"BIM工程师",{"id":566,"name":564,"category":7,"favorite":8},535]