[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-875602":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},875602,564,1,"单选题","一栋10层办公楼，采用风机盘管+新风的空调方案，每层设置1台新风机组，全楼共有风机盘管360台，在工程验收时，空调设备抽检的台数为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1台新风机组和5台风机盘管",false,{"key":16,"text":17,"correct":18},"B","2台新风机组和36台风机盘管",true,{"key":20,"text":21,"correct":14},"C","3台新风机组和54台风机盘管",{"key":23,"text":24,"correct":14},"D","5台新风机组和72台风机盘管","1)新风机组抽查20%：10×20%=2台；2)风机盘管抽查10%(且不少于5台)：360×10%=36台。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（暖通空调专业）","建筑工程",0]