[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-875493":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},875493,564,1,"单选题","某燃煤锅炉房有下列负荷(已经计入输送热损失)：1)散热器供暖系统(95℃\u002F70℃热水)4MW；2)地板辐射供暖系统(50℃\u002F40℃热水)4MW；3)空调系统(60℃\u002F50℃热水)8MW；4)集中生活热水系统及游泳池水加热夏季的最小负荷(0.5MPa蒸汽)2.5MW；5)空调加湿(0.2MPa蒸汽)1800kg\u002Fh。该锅炉房最小的1台蒸汽锅炉蒸发量应该不大于( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","4t\u002Fh",false,{"key":16,"text":17,"correct":18},"B","6t\u002Fh",true,{"key":20,"text":21,"correct":14},"C","8t\u002Fh",{"key":23,"text":24,"correct":14},"D","10t\u002Fh","夏季最小负荷仅有集中生活热水系统及游泳池水加热2.5MW，折合蒸汽蒸发量为3.58t\u002Fh，按照《寒冷标准》第5.2.7条的规定，最小的1台蒸汽锅炉额定蒸发量应该不大于6t\u002Fh。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（暖通空调专业）","建筑工程",0]