[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-875433":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},875433,563,1,"单选题","",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","672.5L\u002Fs，570L\u002Fs",false,{"key":16,"text":17,"correct":14},"B","672.5L\u002Fs，562.5L\u002Fs",{"key":19,"text":20,"correct":14},"C","802.0L\u002Fs，770L\u002Fs",{"key":22,"text":23,"correct":24},"D","672.5L\u002Fs，632.5L\u002Fs",true,"1-2管段的旱流流量为：10+15=25L\u002Fs。2-3管段的旱流流量为：15+20=35L\u002Fs。2-3管段设计流量：第一部分，由2点转输的混合水量为：(2.5+1)×25=87.5L\u002Fs，其中雨水62.5L\u002Fs，污水25L\u002Fs。第二部分，本段的污水量按旱流流量计，35L\u002Fs。第三部分，本段的雨水量为550L\u002Fs。以上三部分相加得：87.5+35+550=672.5L\u002Fs。3-4管段设计流量中的雨水量：第一部分，由上游全部转输的雨水量为：2.5×25+2.0×35=132.5L\u002Fs。第二部分，本段的雨水量为500L\u002Fs。以上两部分相加得：132.5+500=632.5L\u002Fs。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（给排水）","建筑工程",0]