[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-875279":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},875279,563,1,"单选题","A.B.C.",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","图 (A)：2处，图 (B)：1处",true,{"key":16,"text":17,"correct":18},"B","图 (A)：2处，图 (B)：2处",false,{"key":20,"text":21,"correct":18},"C","图 (A)：1处，图 (B)1处",{"key":23,"text":24,"correct":18},"D","图 (A)：1处，图 (B)2处","(1)图(A)：依据《建筑给水排水设计规范》第4.6.9条规定：在横支管上设环形通气管时，应在其最始端的两个卫生器具间接出。图A.中最底下三层的环形通气管连接位置不正确。另外，结合通气管上端应在最高层卫生器具边沿0.15m以上接出，此题连接处位置不满足。(2)图(B)：依据《建筑给水排水设计规范》第4.6.7条规定：通气立管不得接纳器具污水、废水和雨水，不得与风道和烟道连接。图(B)中下部的排水横支管连接了副通气立管。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（给排水）","建筑工程",0]