[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-875131":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},875131,563,1,"单选题","",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","135135",false,{"key":16,"text":17,"correct":14},"B","131670",{"key":19,"text":20,"correct":14},"C","128700",{"key":22,"text":23,"correct":24},"D","124300",true,"(综合生活用水量+工业企业用水量十浇洒道路和绿地用水量十漏损量)×1.1-(60000+38000+4000+11000)×1.1=124300根据《室外给水设计规范》GB50013-2006第4.0.1和4.0.2条，水厂的设计规模计算时不需计入消防水量。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（给排水）","建筑工程",0]