[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-561-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},561,"基础知识（暖通空调+动力）","建筑工程",0,14,50,2939,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,392,404,414,426,438,450,462,474,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},872459,1,"单选题","关于准股本资金的下列说法中，正确的是:",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","准股本资金具有资本金性质，不具有债务资金性质",false,{"key":24,"text":25,"correct":26},"B","准股本资金主要包括优先股股票和可转换债券",true,{"key":28,"text":29,"correct":22},"C","优先股股票在项目评价中应视为项目债务资金",{"key":31,"text":32,"correct":22},"D","可转换债券在项目评价中应视为项目资本金","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},872460,"下列财务评价指标中，反映项目偿债能力的指标是：",[38,40,42,44],{"key":20,"text":39,"correct":22},"投资回收期",{"key":24,"text":41,"correct":26},"利息备付率",{"key":28,"text":43,"correct":22},"财务净现值",{"key":31,"text":45,"correct":22},"总投资收益率",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},872461,"财务生存能力分析中，财务生存的必要条件是：",[50,52,54,56],{"key":20,"text":51,"correct":22},"拥有足够的经营净现金流量",{"key":24,"text":53,"correct":26},"各年累计盈余资金不出现负值",{"key":28,"text":55,"correct":22},"适度的资产负债率",{"key":31,"text":57,"correct":22},"项目资本金净利润率高于同行业的净利润率参考值",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},872462,"某项目建设工期为两年，第一年投资200万元，第二年投资300万元，投产后每年净现金流量为150万元，项目计算期为10年，基准收益率10%，则此项目的财务净现值为：",[62,64,66,68],{"key":20,"text":63,"correct":22},"331. 97 万元",{"key":24,"text":65,"correct":26},"188. 63 万元",{"key":28,"text":67,"correct":22},"171.18 万元",{"key":31,"text":69,"correct":22},"231. 60 万元",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},872463,"某项目初期投资150万元，年运营成本90万元，寿命期5年，寿命期末回收残值20万元，企业基准折现率10%，则该项目的费用现值为：",[74,76,78,80],{"key":20,"text":75,"correct":26},"478. 75 万元",{"key":24,"text":77,"correct":22},"503. 59 万元",{"key":28,"text":79,"correct":22},"511. 63 万元",{"key":31,"text":81,"correct":22},"538. 95 万元",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},872464,"当社会通货膨胀率趋于上升，其他因素没有变化时，基准折现率应：",[86,88,90,92],{"key":20,"text":87,"correct":22},"降低",{"key":24,"text":89,"correct":26},"提高",{"key":28,"text":91,"correct":22},"保持不变",{"key":31,"text":93,"correct":22},"无法确定",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},872465,"全投资财务现金流量表中不包括：",[98,100,102,104],{"key":20,"text":99,"correct":22},"销售收入",{"key":24,"text":101,"correct":26},"贷款成本",{"key":28,"text":103,"correct":22},"经营成本",{"key":31,"text":105,"correct":22},"资产回收",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},872466,"以下有关现金流量表的描述中，说法不正确的是：",[110,112,114,116],{"key":20,"text":111,"correct":22},"财务现金流量表主要用于财务评价",{"key":24,"text":113,"correct":26},"自有资金现金流量表反映投资者各方权益投资的获得能力",{"key":28,"text":115,"correct":22},"通过全投资财务现金流量表可计算项目财务内部收益率、财务净现值和投资回收期等评价指标",{"key":31,"text":117,"correct":22},"全投资财务现金流量表是以项目为一独立系统，从融资前的角度进行设置的",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},872467,"某项目的净年值小于零，则：",[122,124,126,128],{"key":20,"text":123,"correct":22},"该项目是可行的",{"key":24,"text":125,"correct":26},"该项目的内部收益率小于基准折现率",{"key":28,"text":127,"correct":22},"该项目的动态投资回收期小于寿命期",{"key":31,"text":129,"correct":22},"该项目的内部收益率大于基准折现率",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},872468,"与静态投资回收期计算无关的量是：",[134,136,138,140],{"key":20,"text":135,"correct":22},"现金流入",{"key":24,"text":137,"correct":22},"现金流出",{"key":28,"text":139,"correct":22},"净现金流量",{"key":31,"text":141,"correct":26},"基准收益率",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},872469,"在投资项目盈利能力分析中，若选取的基准年发生变动，则该项目的净现值(NPV)的内部收益率(IRR)的数值将是：",[146,148,150,152],{"key":20,"text":147,"correct":26},"NPV变IRR不变",{"key":24,"text":149,"correct":22},"NPV和IRR均变",{"key":28,"text":151,"correct":22},"NPV不变IRR变",{"key":31,"text":153,"correct":22},"NPV和IRR均不变",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},872470,"投资项目W的净现金流量如下表： 则项目W的静态投资回收期为：",[158,160,162,164],{"key":20,"text":159,"correct":22},"3. 65 年",{"key":24,"text":161,"correct":22},"3. 87 年",{"key":28,"text":163,"correct":26},"3 年",{"key":31,"text":165,"correct":22},"3. 55 年",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},872471,"某投资项目，当基准折现率取15%时，项目的净现值等于零，则该项目的内部收益率：",[170,172,174,176],{"key":20,"text":171,"correct":26},"等于15%",{"key":24,"text":173,"correct":22},"大于15%",{"key":28,"text":175,"correct":22},"等于0",{"key":31,"text":177,"correct":22},"小于15%",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},872472,"采用净现值指标对某项目进行财务盈利能力分析，设定的折现率为i，该项目财务上可行的条件是：",[182,184,186,188],{"key":20,"text":183,"correct":22},"NPV≤企业可接受的水平",{"key":24,"text":185,"correct":22},"NPV",{"key":28,"text":187,"correct":26},"NPV≥0",{"key":31,"text":189,"correct":22},"NPV>i",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},872473,"某项目第6年累计净现金流量开始出现正值，第五年末累计净现金流量为-60万元，第6年当年净现金流量为240万元，则该项目的静态投资回收期为：",[194,196,198,200],{"key":20,"text":195,"correct":22},"4. 25 年",{"key":24,"text":197,"correct":22},"4.75 年",{"key":28,"text":199,"correct":26},"5.25 年",{"key":31,"text":201,"correct":22},"6.25 年",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},872474,"某项目初期(第0年年初)投资额为5000万元，此后从第二年年末开始每年有相同的净收益，收益期为10年。寿命期结束时的净残值为零，若基准收益率为15%，则要使该投资方案的净现值为零，其年净收益应为： [已知：（P\u002F A，15%，10）= 5.0188，（P\u002F F，15%，1）=0.8696]",[206,208,210,212],{"key":20,"text":207,"correct":22},"574. 98 万元",{"key":24,"text":209,"correct":22},"866. 31 万元",{"key":28,"text":211,"correct":22},"996. 25 万元",{"key":31,"text":213,"correct":26},"1145. 65 万元",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},872475,"对于某常规项目(IRR唯一)，当设定折现率为12%时，求得的净现值为130万元；当设定折现率为14%时，求得的净现值为-50万元，则该项目的内部收益率应是：",[218,220,222,224],{"key":20,"text":219,"correct":22},"11.56%",{"key":24,"text":221,"correct":22},"12. 77%",{"key":28,"text":223,"correct":22},"13%",{"key":31,"text":225,"correct":26},"13. 44%",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},872476,"经济效益计算的原则是：",[230,232,234,236],{"key":20,"text":231,"correct":22},"增量分析的原则",{"key":24,"text":233,"correct":22},"考虑关联效果的原则",{"key":28,"text":235,"correct":22},"以全国居民作为分析对象的原则",{"key":31,"text":237,"correct":26},"支付意愿原则",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},872477,"某项目财务现金流量见下表，则该项目的静态投资回收期为多少年？",[242,244,246,248],{"key":20,"text":243,"correct":22},"5.4",{"key":24,"text":245,"correct":22},"5. 6",{"key":28,"text":247,"correct":26},"7.4",{"key":31,"text":249,"correct":22},"7. 6",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},872478,"下列关于经济效益和经济费用的表述中，正确的是：",[254,256,258,260],{"key":20,"text":255,"correct":22},"经济效益只考虑项目的直接效益",{"key":24,"text":257,"correct":26},"项目对提高社会福利和社会经济所作的贡献都记为经济效益",{"key":28,"text":259,"correct":22},"计算经济费用效益指标采用企业设定的折现率",{"key":31,"text":261,"correct":22},"影子价格是项目投入物和产出物的市场平均价格",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},872479,"对建设项目进行经济费用效益分析所使用的影子价格的正确含义是：",[266,268,270,272],{"key":20,"text":267,"correct":22},"政府为保证国计民生为项目核定的指导价格",{"key":24,"text":269,"correct":22},"使项目产出品具有竞争力的价格",{"key":28,"text":271,"correct":22},"项目投入物和产出物的市场最低价格",{"key":31,"text":273,"correct":26},"反映项目投入物和产出物真实经济价值的价格",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},872480,"以下关于项目经济费用效益分析的说法中正确的是：",[278,280,282,284],{"key":20,"text":279,"correct":22},"经济费用效益分析应考虑沉没成本",{"key":24,"text":281,"correct":22},"经济费用和效益的识别不适用“有无对比”原则",{"key":28,"text":283,"correct":26},"识别经济费用效益时应剔出项目的转移支付",{"key":31,"text":285,"correct":22},"为了反映投入物和产出物真实经济价值，经济费用效益分析不能使用市场价格",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},872481,"交通运输部门拟修建一条公路，预计建设期为一年，建设期初投资为100 万元，建设后即投入使用，预计使用寿命为10年，每年将产生的效益为20万元，每年需投入保养费8000元。若社会折现率为10%，则该项目的效益费用比为：",[290,292,294,296],{"key":20,"text":291,"correct":26},"1. 07",{"key":24,"text":293,"correct":22},"1. 17",{"key":28,"text":295,"correct":22},"1. 85",{"key":31,"text":297,"correct":22},"1. 92",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},872482,"河外贸货物的投入或产出的影子价格应根据口岸价格计算，下列公式正确的是： A. 出口产出的影子价格(出厂价)=离岸价(FO B) X影子汇率+出口费用 B. 出口产出的影子价格(出厂价)=到岸价(CI F) X影子汇率-出口费用",[302,304,306,308],{"key":20,"text":303,"correct":22},"进口投入的影子价格(到厂价)=到岸价(CI",{"key":24,"text":305,"correct":22},"X影子汇率+进口费用",{"key":28,"text":307,"correct":26},"进口投入的影子价格(到厂价)=离岸价(FO",{"key":31,"text":309,"correct":22},"X影子汇率-进口费用",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},872483,"某建设项目年设计生产能力为8万台，年固定成本为1200万元，产品单台售价为1000元，单台产品可变成本为600元，单台产品销售税金及附加为150元，则该项目的盈亏平衡点的产销量为：",[314,316,318,320],{"key":20,"text":315,"correct":26},"48000 台",{"key":24,"text":317,"correct":22},"12000 台",{"key":28,"text":319,"correct":22},"30000 台",{"key":31,"text":321,"correct":22},"21819 台",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},872484,"在单因素敏感分析图中，下列哪一项影响因素说明该因素越敏感？",[326,328,330,332],{"key":20,"text":327,"correct":22},"直线的斜率为负",{"key":24,"text":329,"correct":22},"直线的斜率为正",{"key":28,"text":331,"correct":26},"直线的斜率绝对值越大",{"key":31,"text":333,"correct":22},"直线的绝对值越小",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},872485,"盈亏平衡分析是一种特殊形式的临界点分析，它适用于财务评价，其计算应按项目投产后以下哪项计算？",[338,340,342,344],{"key":20,"text":339,"correct":26},"正常年份的销售收入和成本费用数据利润总额",{"key":24,"text":341,"correct":22},"计算期内的平均值",{"key":28,"text":343,"correct":22},"年产量",{"key":31,"text":345,"correct":22},"单位产品销售价格",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},872486,"成本可分为固定成本和可变成本，假设生产规模一定，以下说法中正确的是",[350,352,354,356],{"key":20,"text":351,"correct":22},"产量增加，但固定成本在单位产品中的成本不变",{"key":24,"text":353,"correct":26},"单位产品中固定成本部分随产量增加而减少",{"key":28,"text":355,"correct":22},"固定成本低于可变成本时才能盈利",{"key":31,"text":357,"correct":22},"固定成本与可变成本相等时利润为零",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},872487,"某吊车生产企业，以产量表示的盈亏平衡点为600台。预计今年的固定成本将增加20%，若其他条件不变，则盈亏平衡点将变为：",[362,364,366,368],{"key":20,"text":363,"correct":26},"720 台",{"key":24,"text":365,"correct":22},"600 台",{"key":28,"text":367,"correct":22},"500 台",{"key":31,"text":369,"correct":22},"480 台",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},872488,"某企业生产一种产品，年固定成本为1000万元，单位产品的可变成本为300元、售价为500元，则其盈亏平衡点的销售收入为：",[374,376,378,380],{"key":20,"text":375,"correct":22},"5万元",{"key":24,"text":377,"correct":22},"600万元",{"key":28,"text":379,"correct":22},"1500万元",{"key":31,"text":381,"correct":26},"2500万元",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},872489,"建设项目经济评价有一整套指标体系，敏感性分析可选定其中一个或几个主要指标进行分析，最基本的分析指标是：",[386,387,389,390],{"key":20,"text":43,"correct":22},{"key":24,"text":388,"correct":26},"内部收益率",{"key":28,"text":39,"correct":22},{"key":31,"text":391,"correct":22},"偿债备付率",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},872490,"关于盈亏平衡点的下列说法中，错误的是：",[396,398,400,402],{"key":20,"text":397,"correct":22},"盈亏平衡点是项目的盈利与亏损的转折点",{"key":24,"text":399,"correct":22},"盈亏平衡点上，销售(营业、服务)收入等于总成本费用",{"key":28,"text":401,"correct":26},"盈亏平衡点越低，表明项目抗风险能力越弱",{"key":31,"text":403,"correct":22},"盈亏平衡分析只用于财务分析",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},872491,"在进行互斥方案选优时，若备选方案的收益率基本相同，且难于估计时，比选计算应考虑采用：",[408,409,411,412],{"key":20,"text":388,"correct":22},{"key":24,"text":410,"correct":22},"净现值",{"key":28,"text":39,"correct":22},{"key":31,"text":413,"correct":26},"费用现值",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},872492,"采用净现值(NPV)、内部收益率(IRR)和差额内部收益率(ΔIRR)进行互斥方案比选，它们的评价结论是：",[418,420,422,424],{"key":20,"text":419,"correct":22},"NPV和ΔIRR总是不一致的",{"key":24,"text":421,"correct":22},"IRR和ΔIRR总是一致的",{"key":28,"text":423,"correct":26},"NPV和ΔIRR总是一致的",{"key":31,"text":425,"correct":22},"NPV、IRR和ΔIRR总是不一致的",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},872493,"两个初始投资相同、寿命期相同的投资方案，下列说法中正确的是：",[430,432,434,436],{"key":20,"text":431,"correct":22},"NPV1=NPV2，则IRR1= IRR2",{"key":24,"text":433,"correct":22},"NPV1>NPV2，则IRR1>IRR2",{"key":28,"text":435,"correct":22},"NPV1>NPV2，则IRR12",{"key":31,"text":437,"correct":26},"NPV1>NPV2≥0，则方案 1 较优",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},872494,"某项目有甲乙丙丁4个投资方案，寿命期都是8年，设定的折现率8%，(A\u002FP, 8%,8)=0. 1740，各方案各年的净现金流量如表所示，采用年值法应选用：",[442,444,446,448],{"key":20,"text":443,"correct":22},"甲方案",{"key":24,"text":445,"correct":22},"乙方案",{"key":28,"text":447,"correct":22},"丙方案",{"key":31,"text":449,"correct":26},"丁方案",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},872495,"已知甲、乙为两个寿命期相同的互斥项目，其中乙项目投资大于甲项目。通过测算得出甲、乙两项目的内部收益率分别为17%和14%，增量内部收益△IRR(乙—甲)= 13%，基准收益率为14%，以下说法中正确的是：",[454,456,458,460],{"key":20,"text":455,"correct":26},"应选择甲项目",{"key":24,"text":457,"correct":22},"应选择乙项目",{"key":28,"text":459,"correct":22},"应同时选择甲、乙两个项目",{"key":31,"text":461,"correct":22},"甲、乙两项目均不应选择",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},872496,"下列项目方案类型中，适于采用净现值法直接进行方案选优的是：",[466,468,470,472],{"key":20,"text":467,"correct":22},"寿命期相同的独立方案",{"key":24,"text":469,"correct":22},"寿命期不同的独立方案",{"key":28,"text":471,"correct":26},"寿命期相同的互斥方案",{"key":31,"text":473,"correct":22},"寿命期不同的互斥方案",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":33},872497,"在项目无资金约束、寿命不同、产出不同的条件下，方案经济比选只能采用:",[478,480,482,484],{"key":20,"text":479,"correct":22},"净现值比较法",{"key":24,"text":481,"correct":22},"差额投资内部收益率法",{"key":28,"text":483,"correct":26},"净年值法",{"key":31,"text":485,"correct":22},"费用年值法",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},872498,"以下关于改扩建项目财务分析的说法中正确的是：",[490,492,494,496],{"key":20,"text":491,"correct":22},"应以财务生存能力分析为主",{"key":24,"text":493,"correct":22},"应以项目清偿能力分析为主",{"key":28,"text":495,"correct":22},"应以企业层次为主进行财务分析",{"key":31,"text":497,"correct":26},"应遵循“有无对比”原刚",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},872499,"属宁改扩建项目经济评价中使用的五种数据之一的是:",[502,504,506,508],{"key":20,"text":503,"correct":22},"资产",{"key":24,"text":505,"correct":22},"资源",{"key":28,"text":507,"correct":22},"效益",{"key":31,"text":509,"correct":26},"增量",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},872500,"对于改扩建项目的经济评价，以下表述中正确的是：",[514,516,518,520],{"key":20,"text":515,"correct":22},"仅需要估算“有项目”、“无项目”、“增量”三种状态下的效益和费用",{"key":24,"text":517,"correct":22},"只对项目本身进行经济性评价，不考虑对既有企业的影响",{"key":28,"text":519,"correct":22},"财务分析一般只按项目一个层次进行财务分析",{"key":31,"text":521,"correct":26},"需要合理确定原有资产利用、停产损失和沉没成本",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":28,"analysis":33},872501,"ABC分类法中，部件数量占60%~80%、成本占5%~10%的为:",[526,528,530,532],{"key":20,"text":527,"correct":22},"A类",{"key":24,"text":529,"correct":22},"B类",{"key":28,"text":531,"correct":26},"C类",{"key":31,"text":533,"correct":22},"以上都不对",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},872502,"下列可以提高产品价值的是：",[538,540,542,544],{"key":20,"text":539,"correct":22},"功能不变，提高成本",{"key":24,"text":541,"correct":22},"成本不变，降低功能",{"key":28,"text":543,"correct":26},"成本增加一些，功能有很大提高",{"key":31,"text":545,"correct":22},"功能很大降低，成本降低一些",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},872503,"价值工程的价值是：",[550,552,554,556],{"key":20,"text":551,"correct":22},"研究对象的使用价值",{"key":24,"text":553,"correct":22},"研究对象的交换价值",{"key":28,"text":555,"correct":22},"研究对象的使用和交换价值",{"key":31,"text":557,"correct":26},"研究对象所具有的功能与获得该功能的全部费用的比值",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":28,"analysis":33},872504,"开展价值工程活动的目的是：",[562,564,566,568],{"key":20,"text":563,"correct":22},"思想方法的更新和技术管理",{"key":24,"text":565,"correct":22},"对功能和成本进行系统分析和不断创新",{"key":28,"text":567,"correct":26},"提高功能对成本的比值",{"key":31,"text":569,"correct":22},"多领域协作降低产品成本",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},872505,"价值工程的“价值(V)”对于产品来说，可以表示为V=F\u002F C，F指产品的功能，而C则是指：",[574,576,578,580],{"key":20,"text":575,"correct":22},"产品的制造成本",{"key":24,"text":577,"correct":26},"产品的寿命周期成本",{"key":28,"text":579,"correct":22},"产品的使用成本",{"key":31,"text":581,"correct":22},"产品的研发成本",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},872506,"已知某产品的零件甲的功能评分为5，成本为20元，该产品各零件功能积分之和为40，产品成本为100元，则零件甲的价值系数为：",[586,588,590,592],{"key":20,"text":587,"correct":22},"0. 2",{"key":24,"text":589,"correct":26},"0. 625",{"key":28,"text":591,"correct":22},"0. 8",{"key":31,"text":593,"correct":22},"1. 6",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":28,"analysis":33},872507,"下面关于价值工程的论述中正确的是：",[598,600,602,604],{"key":20,"text":599,"correct":22},"价值工程中的价值是指成本与功能的比值",{"key":24,"text":601,"correct":22},"价值工程中的价值是指产品消耗的必要劳动时间",{"key":28,"text":603,"correct":26},"价值工程中的成本是指寿命周期成本，包括产品在寿命期内发生的全部费用",{"key":31,"text":605,"correct":22},"价值工程中的成本就是产品的生产成本，它随着产品功能的增加而提高",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},872508,"某项目由 A、 B、 C、D四个部分组成，当采用强制确定法进行价值工程对象选择时，它们的价值指数分别如下所示。其中不应作为价值工程分析对象的是：",[610,612,614,616],{"key":20,"text":611,"correct":22},"0.7559",{"key":24,"text":613,"correct":26},"1.0000",{"key":28,"text":615,"correct":22},"1. 2245",{"key":31,"text":617,"correct":22},"1. 5071",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]