[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-58687":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},58687,56,2,"多选题","成本计划完成情况分析的内容有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","全部产品总成本计划完成情况的分析",true,{"key":16,"text":17,"correct":14},"B","可比产品成本降低任务完成情况的分析",{"key":19,"text":20,"correct":14},"C","主要产品单位成本的分析",{"key":22,"text":23,"correct":24},"D","次要产品单位成本平均分析",false,{"key":26,"text":27,"correct":24},"E","成本水平分析","ABC","成本计划完成情况分析是事后成本总结分析的内容之一，其包括以下几方面：①全部产品总成本计划完成情况的分析；②可比产品成本降低任务完成情况的分析；③主要产品单位成本的分析。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)农业经济","经济金融",0]