[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-58660":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},58660,56,2,"多选题","计划完成情况的分析包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","生产计划完成程度分析",true,{"key":16,"text":17,"correct":14},"B","产品成本计划完成情况分析",{"key":19,"text":20,"correct":14},"C","生产要素利用情况分析",{"key":22,"text":23,"correct":24},"D","企业领导阶层人员变动分析",false,{"key":26,"text":27,"correct":14},"E","利润计划完成情况分析","ABCE","计划完成情况分析，主要包括以下内容：①生产计划完成程度及生产要素利用情况分析；②产品成本计划完成情况分析；③产品销售计划完成情况分析；④利润计划完成情况分析；⑤财务计划完成情况分析等。",{"id":6,"name":31,"category":32,"favorite":33},"(初级)农业经济","经济金融",0]