[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-559-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},559,"C证（专职安全员）","建筑工程",0,3,50,413,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,237,249,261,273,285,297,308,320,332,344,352,364,374,384,396,405,413,425,434,446,454,466,478,490,502,514,532,547,562,577,592,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},868543,1,"单选题","临时用房的燃烧性能等级应为（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","A级",true,{"key":24,"text":25,"correct":26},"B","B级",false,{"key":28,"text":29,"correct":26},"C","B1级",{"key":31,"text":32,"correct":26},"D","B2级","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},868544,"履带式起重机传动方式有（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"一种",{"key":24,"text":41,"correct":26},"两种",{"key":28,"text":43,"correct":22},"三种",{"key":31,"text":45,"correct":26},"四种",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},868545,"灭火器、临时消防给jǐ水系统、消防应急照明、疏散指示标识、临时疏散通道等统称为（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"消防配置",{"key":24,"text":53,"correct":26},"消防要素",{"key":28,"text":55,"correct":26},"消防设施",{"key":31,"text":57,"correct":22},"临时消防设施",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},868546,"模板支架采用木立柱时，高度不应超过（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"5m",{"key":24,"text":65,"correct":26},"5.5m",{"key":28,"text":67,"correct":26},"6m",{"key":31,"text":69,"correct":26},"6.5m",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},868547,"模板支架高度超过（）时，不应采用门式钢管脚手架。",[74,76,78,80],{"key":20,"text":75,"correct":26},"10m",{"key":24,"text":77,"correct":26},"12m",{"key":28,"text":79,"correct":26},"14m",{"key":31,"text":81,"correct":22},"16m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},868548,"目前我国推广应用量较大的定型组合模板是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"定型组合钢模板",{"key":24,"text":89,"correct":26},"钢木定型组合模板",{"key":28,"text":91,"correct":26},"组合模板",{"key":31,"text":93,"correct":26},"定型木模板",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},868549,"内爬升作业应在白天进行。风力超过（）时，应停止作业。",[98,100,102,104],{"key":20,"text":99,"correct":26},"4级",{"key":24,"text":101,"correct":22},"5级",{"key":28,"text":103,"correct":26},"6级",{"key":31,"text":105,"correct":26},"7级",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},868550,"配电装置送电操作顺序为：（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"总配电箱(配电柜)一分配电箱一开关箱",{"key":24,"text":113,"correct":26},"分配电箱一总配电箱(配电柜)一开关箱",{"key":28,"text":115,"correct":26},"总配电箱(配电柜)一开关箱一分配电箱",{"key":31,"text":117,"correct":26},"开关箱一分配电箱一总配电箱(配电柜)",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},868551,"人工开挖土方时，两个人操作间距应保持（），并应自上而下逐层挖掘，严禁采用掏洞的挖掘操作方法。",[122,124,126,128],{"key":20,"text":123,"correct":26},"1m～2m",{"key":24,"text":125,"correct":22},"2m～3m",{"key":28,"text":127,"correct":26},"3m～4m",{"key":31,"text":129,"correct":26},"4m～5m",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},868552,"三级动火作业由所在单位（）填写，经本单位项目部施工负责人审查批准，方可动火。",[134,136,138,140],{"key":20,"text":135,"correct":26},"安全监理",{"key":24,"text":137,"correct":26},"专职安全员",{"key":28,"text":139,"correct":22},"班组",{"key":31,"text":141,"correct":26},"操作人员",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},868553,"施工单位（）的职责是参与施工组织设计和安全技术措施的编制，并组织进行定期和不定期的安全生产检查。",[146,148,150,152],{"key":20,"text":147,"correct":26},"主要负责人",{"key":24,"text":149,"correct":26},"技术负责人",{"key":28,"text":151,"correct":26},"生产部门",{"key":31,"text":153,"correct":22},"安全部门",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},868554,"施工单位采购、租赁的安全防护用具、机械设备、施工机具及配件，应当具有生产(制造)许可证、产品合格证，并在（）进行查验。",[158,160,162,164],{"key":20,"text":159,"correct":26},"运输前",{"key":24,"text":161,"correct":22},"进入施工现场前",{"key":28,"text":163,"correct":26},"使用前",{"key":31,"text":165,"correct":26},"使用中",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},868555,"施工升降机安装拆卸作业应设置警戒区域，并设专人监护，无关人员不得入内。（）应在现场监督整个安装拆卸程序。",[170,172,174,176],{"key":20,"text":171,"correct":26},"施工员",{"key":24,"text":173,"correct":26},"机械员",{"key":28,"text":175,"correct":22},"专职安全生产管理人员",{"key":31,"text":177,"correct":26},"项目负责人",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},868556,"施工用电检查评分表中，工作接地电阻大于4Ω，重复接地电阻大于10Ω，扣（）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"8分",{"key":24,"text":185,"correct":26},"10分",{"key":28,"text":187,"correct":26},"15分",{"key":31,"text":189,"correct":22},"20分",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},868558,"推土机在深沟、基坑或陡坡地区作业时，应有专人指挥，垂直边坡高度应小于（）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"1m",{"key":24,"text":197,"correct":22},"2m",{"key":28,"text":199,"correct":26},"3m",{"key":31,"text":201,"correct":26},"4m",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},868559,"违反《特种设备安全法》规定，特种设备的制造、安装、改造、重大修理以及锅炉清洗过程，未经监督检验的，责令限期改正；逾期未改正的，处（）；有违法所得的，没收违法所得；情节严重的，吊销生产许可证。",[206,208,210,212],{"key":20,"text":207,"correct":26},"五万元以上十万元以下罚款",{"key":24,"text":209,"correct":26},"三万元以上二十万元以下罚款",{"key":28,"text":211,"correct":22},"五万元以上二十万元以下罚款",{"key":31,"text":213,"correct":26},"三万元以上十万元以下罚款",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},868560,"文明施工检查评分表中，施工现场未采取防尘措施，扣（）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"2分",{"key":24,"text":221,"correct":26},"3分",{"key":28,"text":223,"correct":22},"5分",{"key":31,"text":183,"correct":26},{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},868561,"先开挖基坑中部的土方，挖土过程中在基坑中部形成类似盆状的土体，然后再开挖基坑周边的土体，这种挖土方式通常称为（）。",[229,231,233,235],{"key":20,"text":230,"correct":26},"分段开挖",{"key":24,"text":232,"correct":26},"岛式开挖",{"key":28,"text":234,"correct":26},"分层开挖",{"key":31,"text":236,"correct":22},"盆式开挖",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},868562,"一般工业生产中使用的水泵多为（）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"往复式(活塞式)水泵",{"key":24,"text":244,"correct":26},"回转式水泵",{"key":28,"text":246,"correct":26},"螺旋桨式水泵",{"key":31,"text":248,"correct":22},"离心式水泵",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},868563,"意外伤害保险期限自建设工程开工之日起至（）止。",[253,255,257,259],{"key":20,"text":254,"correct":26},"竣工",{"key":24,"text":256,"correct":26},"竣工验收",{"key":28,"text":258,"correct":26},"主体工程完工",{"key":31,"text":260,"correct":22},"竣工验收合格",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},868564,"主节点处必须设有纵、横向水平杆，并采用直角扣件固定，两个直角扣件的中心距离不应大于（），水平杆距离不应大于（）",[265,267,269,271],{"key":20,"text":266,"correct":26},"100mm;1.8m",{"key":24,"text":268,"correct":26},"120mm;1.8m",{"key":28,"text":270,"correct":22},"150mm;1.8m",{"key":31,"text":272,"correct":26},"150mm;1.5m",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},868565,"根据《建设工程安全生产管理条例》规定，垂直运输机械作业人员，安装拆卸工、爆破作业人员、起重信号工、登高架作业人员等特种作业人员，必须按照国家有关规定经过（），并取得特种祖业操作资格证书后，方可上岗作业。",[277,279,281,283],{"key":20,"text":278,"correct":26},"三级教育",{"key":24,"text":280,"correct":22},"专门的安全作业培训",{"key":28,"text":282,"correct":26},"安全常识培训",{"key":31,"text":284,"correct":26},"安全技术交底",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},868566,"和麻绳配用的卷筒和滑车的直径，机动时应大于麻绳直径的30倍；使用人力时，应当大于麻绳直径的（）。",[289,291,293,295],{"key":20,"text":290,"correct":26},"3倍",{"key":24,"text":292,"correct":26},"5倍",{"key":28,"text":294,"correct":26},"8倍",{"key":31,"text":296,"correct":22},"10倍",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},868567,"根据《脚手架施工现场专项应急方案》，悬挂式脚手架应编制专项方案，并进行受力计算，超过（）高度应组织专家评审。",[301,302,304,306],{"key":20,"text":75,"correct":26},{"key":24,"text":303,"correct":26},"15m",{"key":28,"text":305,"correct":22},"20m",{"key":31,"text":307,"correct":26},"30m",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},868568,"架子工属于特种人也人员，必须经（）考核合格，取得建筑施工特种作业人员操作资格证书，方可上岗从事相应作业。",[312,314,316,318],{"key":20,"text":313,"correct":22},"建设主管部门",{"key":24,"text":315,"correct":26},"建设单位",{"key":28,"text":317,"correct":26},"施工总承包单位",{"key":31,"text":319,"correct":26},"监理单位",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},868569,"支架立杆间距应有计算确定，且最大距离不应大于（）",[324,326,328,330],{"key":20,"text":325,"correct":22},"1.2m",{"key":24,"text":327,"correct":26},"1.4m",{"key":28,"text":329,"correct":26},"1.6m",{"key":31,"text":331,"correct":26},"1.8m",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},868570,"根据《建筑施工升降机安装、使用、拆卸安全技术规程》规定，安装作业时，必须将按钮盒或操作盒移至（）操作。当导轨架成附墙架上有人员作业时，严禁开动施工升降机。",[336,338,340,342],{"key":20,"text":337,"correct":26},"吊笼外部",{"key":24,"text":339,"correct":26},"吊笼内部",{"key":28,"text":341,"correct":22},"吊笼顶部",{"key":31,"text":343,"correct":26},"吊笼底部",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},868571,"模板支架采用木立柱是，高度不应超过（）",[348,349,350,351],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":26},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":31,"analysis":33},868572,"直流电焊机具有造价低、（）、电弧稳定和噪音小的优点。",[356,358,360,362],{"key":20,"text":357,"correct":26},"结构简单",{"key":24,"text":359,"correct":26},"易造维修",{"key":28,"text":361,"correct":26},"空载损耗小",{"key":31,"text":363,"correct":22},"效率高",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},868573,"根据《建筑施工安全技术统一规范》规定，建设单位、施工单位、监理单位以及其他个单位在工程竣工或有关安全技术活动结束后30天内，应将安全技术文件交（）档案室归档，档案保存期应不少于1年。",[368,370,371,373],{"key":20,"text":369,"correct":22},"本单位",{"key":24,"text":315,"correct":26},{"key":28,"text":372,"correct":26},"施工单位",{"key":31,"text":319,"correct":26},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},868574,"根据《建筑施工高处作业安全技术规范》规定，两层防护的间距不应小于700mm，安全防护棚的搭设高度不应小于（）",[378,380,381,383],{"key":20,"text":379,"correct":26},"2.5m",{"key":24,"text":199,"correct":26},{"key":28,"text":382,"correct":26},"3.5m",{"key":31,"text":201,"correct":22},{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},868575,"连墙件中的连墙杆或拉筋宜是（），当不能水平设置时，与脚手架连接的一段应（）。",[388,390,392,394],{"key":20,"text":389,"correct":26},"水平设置；上斜连接",{"key":24,"text":391,"correct":26},"垂直设置；上斜连接",{"key":28,"text":393,"correct":22},"水平设置；下斜连接",{"key":31,"text":395,"correct":26},"垂直设置；下斜连接",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},868576,"根据《建筑施工碗扣式钢管脚手架安全技术规范》规定，脚手架模板支撑架应按先立杆、后水平杆、再斜杆的顺序搭设行程基本架体单元，并应以基本架体单元逐排、逐层扩展搭设成整理支撑架体系统，每层搭设高度不宜大于（）",[400,401,402,403],{"key":20,"text":199,"correct":22},{"key":24,"text":382,"correct":26},{"key":28,"text":201,"correct":26},{"key":31,"text":404,"correct":26},"4.5m",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},868577,"施工用电检查评分表中，施工接地电阻大于4Ω，重复接地电阻大于10Ω，扣（）",[409,410,411,412],{"key":20,"text":183,"correct":26},{"key":24,"text":185,"correct":26},{"key":28,"text":187,"correct":26},{"key":31,"text":189,"correct":22},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":28,"analysis":33},868578,"根据《工伤保险条例》的规定，停工留薪其一般不超过12个月。伤情严重或者情况特殊的，经设区的市级劳动能力鉴定委员会确定，可以适当延长，但延长期不得超过（）。",[417,419,421,423],{"key":20,"text":418,"correct":26},"30个月",{"key":24,"text":420,"correct":26},"18个月",{"key":28,"text":422,"correct":22},"12个月",{"key":31,"text":424,"correct":26},"24个月",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},868579,"施焊现场（）范围内，不得堆放油类、木材、氧气瓶、乙炔发生器等易燃、易爆物品。",[429,430,431,433],{"key":20,"text":63,"correct":26},{"key":24,"text":67,"correct":26},{"key":28,"text":432,"correct":26},"8m",{"key":31,"text":75,"correct":22},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},868580,"根据《安全生产法》规定，生产经营单位与从业人员订立协议，免除或者减轻其对从业人员因生产安全事故伤亡依法应当承担的责任的，该协议无效；对生产经营单位的主要负责人、个人经营的投资人处（）。",[438,440,442,444],{"key":20,"text":439,"correct":26},"一万元以上十万元以下的罚款",{"key":24,"text":441,"correct":22},"二万元以上十万元以下的罚款",{"key":28,"text":443,"correct":26},"一万元以上五万元以下的罚款",{"key":31,"text":445,"correct":26},"二万元以上五万元以下的罚款",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},868581,"意外伤害保险期限自建设工程开工之日起至（）。",[450,451,452,453],{"key":20,"text":254,"correct":26},{"key":24,"text":256,"correct":26},{"key":28,"text":258,"correct":26},{"key":31,"text":260,"correct":22},{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},868582,"支架立杆必须设置纵、横向扫地杆，纵向扫地杆距离地面（）",[458,460,462,464],{"key":20,"text":459,"correct":22},"200mm",{"key":24,"text":461,"correct":26},"220mm",{"key":28,"text":463,"correct":26},"240mm",{"key":31,"text":465,"correct":26},"250mm",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},868583,"根据《工伤保险条例》的规定，用人单位未按规定向统筹地区社会保险行政部门提出工伤认定申请的，工伤职工或者其近亲属、工会组织在事故伤害发生之日或者被诊断、鉴定为职业病之日起（），可以直接向用人单位所在的统筹地区社会保险行政部门提出工伤认定申请。",[470,472,474,476],{"key":20,"text":471,"correct":26},"随时",{"key":24,"text":473,"correct":22},"1年内",{"key":28,"text":475,"correct":26},"2年内",{"key":31,"text":477,"correct":26},"3年内",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},868584,"在潮湿场所或金属构架上操作时，必须选用II类或由安全隔离变压器供电的（）手持式电动工具，严禁使用（）工具手持式电动工具。",[482,484,486,488],{"key":20,"text":483,"correct":26},"II类；III类",{"key":24,"text":485,"correct":22},"III类；I类",{"key":28,"text":487,"correct":26},"I类；III类",{"key":31,"text":489,"correct":26},"II类；I类",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},868585,"钢丝绳采用编结固结时，编结部分的长度不得小于钢丝绳直径的20倍，并应不小于（），其编结部分应用细钢丝捆扎。",[494,496,498,500],{"key":20,"text":495,"correct":22},"300mm",{"key":24,"text":497,"correct":26},"350mm",{"key":28,"text":499,"correct":26},"400mm",{"key":31,"text":501,"correct":26},"450mm",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},868586,"人工开挖时，两个人操作间距应保持（），并应自上而下逐层挖掘，严禁采用掏洞的挖掘操作方法。",[506,508,510,512],{"key":20,"text":507,"correct":26},"1m-2m",{"key":24,"text":509,"correct":22},"2m-3m",{"key":28,"text":511,"correct":26},"3m-4m",{"key":31,"text":513,"correct":26},"4m-5m",{"id":515,"libraryId":5,"type":516,"typeLabel":517,"stem":518,"options":519,"answer":531,"analysis":33},868587,2,"多选题","《建设工程高大模板支撑系统施工安全监督管理导则》规定，施工过程中检查项目应符合下列（ ）等要求。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"立柱底部基础应回填夯实",{"key":24,"text":523,"correct":22},"垫木应满足设计要求",{"key":28,"text":525,"correct":22},"底座位置应正确，顶托螺杆伸出长度应符合规定",{"key":31,"text":527,"correct":22},"立柱的规格尺寸和垂直度应符合要求，不得出现偏心荷载",{"key":529,"text":530,"correct":22},"E","安全网和各种安全防护设施符合要求","ABCDE",{"id":533,"libraryId":5,"type":516,"typeLabel":517,"stem":534,"options":535,"answer":546,"analysis":33},868588,"某工业厂房进行改建，工业厂房附近有一个二层楼，一楼存放的是白磷、红憐、硫磺等化学物品，二楼暂时闲置。由于空间狭窄，施工单位与建设单位协商使用二层楼，下属说法正确的是（ ）。",[536,538,540,542,544],{"key":20,"text":537,"correct":26},"二楼可以作为员工宿舍",{"key":24,"text":539,"correct":22},"二楼可以作为现场临时仓储用房",{"key":28,"text":541,"correct":26},"经安全部门同意可作为员工宿舍",{"key":31,"text":543,"correct":22},"整栋楼不得作为员工宿舍",{"key":529,"text":545,"correct":26},"整栋楼不得作办公用房","BD",{"id":548,"libraryId":5,"type":516,"typeLabel":517,"stem":549,"options":550,"answer":561,"analysis":33},868589,"下列关于脚手架工程表述正确的有（ ）。",[551,553,555,557,559],{"key":20,"text":552,"correct":22},"登高架设作业人员须取得特种操作资格证书后，方可上岗",{"key":24,"text":554,"correct":26},"登高架设作业人员经过企业的安全教育培训合格后，即可上岗",{"key":28,"text":556,"correct":22},"脚手架工程应编制专项施工方案，并附具安全验算",{"key":31,"text":558,"correct":26},"脚手架工程的施工方案必须经专家论证",{"key":529,"text":560,"correct":22},"脚手架工程的施工方案经总监理工程师签字后方可实施","ACE",{"id":563,"libraryId":5,"type":516,"typeLabel":517,"stem":564,"options":565,"answer":576,"analysis":33},868590,"施工现场的施工区域应与（ ）划分清晰，并应采取相应的隔离措施。",[566,568,570,572,574],{"key":20,"text":567,"correct":22},"生活区",{"key":24,"text":569,"correct":22},"办公区",{"key":28,"text":571,"correct":26},"堆料区",{"key":31,"text":573,"correct":26},"加工区",{"key":529,"text":575,"correct":26},"安装","AB",{"id":578,"libraryId":5,"type":516,"typeLabel":517,"stem":579,"options":580,"answer":591,"analysis":33},868591,"建筑物每层应配备消防设施，30m 及以上的高层建筑应随层（ ）。",[581,583,585,587,589],{"key":20,"text":582,"correct":26},"设消防水源管道",{"key":24,"text":584,"correct":22},"设加压水泵",{"key":28,"text":586,"correct":22},"立管直径2寸以上",{"key":31,"text":588,"correct":22},"配备足够灭火器",{"key":529,"text":590,"correct":22},"每层应设出水管口","BCDE",{"id":593,"libraryId":5,"type":516,"typeLabel":517,"stem":594,"options":595,"answer":531,"analysis":33},868592,"对现场易飞扬物质应釆取（ ）等有效措施，防止扬尘产生。",[596,598,600,602,604],{"key":20,"text":597,"correct":22},"洒水",{"key":24,"text":599,"correct":22},"地面硬化",{"key":28,"text":601,"correct":22},"围档",{"key":31,"text":603,"correct":22},"密网覆盖",{"key":529,"text":605,"correct":22},"封闭",{"id":607,"libraryId":5,"type":516,"typeLabel":517,"stem":608,"options":609,"answer":620,"analysis":33},868593,"施工现场消防防火重点部位，如（ ）等应采取必要的消防安全措施，配备专用消防器材，并有专人负责。",[610,612,614,616,618],{"key":20,"text":611,"correct":22},"易燃易爆物品堆放间",{"key":24,"text":613,"correct":26},"工人宿舍",{"key":28,"text":615,"correct":22},"木工间",{"key":31,"text":617,"correct":22},"油漆间",{"key":529,"text":619,"correct":26},"档案室","ACD",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]