[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-868617":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},868617,559,2,"多选题","根据《高大模板支撑系统施工现场专项应急方案》，发生坍塌事故后应（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","警戒隔离",true,{"key":16,"text":17,"correct":14},"B","人员疏散",{"key":19,"text":20,"correct":14},"C","人员抢救",{"key":22,"text":23,"correct":14},"D","控制险情",{"key":25,"text":26,"correct":14},"E","设置向导","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"C证（专职安全员）","建筑工程",0]