[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-868596":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},868596,559,2,"多选题","基础工程结束时，应提交完整的监测报告，报告内容应包括：（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程概况",true,{"key":16,"text":17,"correct":14},"B","检测项目及测点平面图",{"key":19,"text":20,"correct":14},"C","采用仪器设备和监测方法",{"key":22,"text":23,"correct":14},"D","检测数据和结果",{"key":25,"text":26,"correct":14},"E","检测结果评价","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"C证（专职安全员）","建筑工程",0]