[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-558-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},558,"江苏省C2证（土建安全员）","建筑工程",0,29,50,1521,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},868322,3,"判断题","职业道德是指在一定的社会经济关系中，从事各种不同职业的人们在其特定职业活动中应遵循的职业行为规范的总和。（ ）",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},868323,"环境道德是当代社会公德之一。（ ）",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},868324,"道德不仅调节人与人之间的关系，而且平衡人与自然之间的关系。要求人们端正对自然的态度，调节自身的行为。（ ）",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},868325,"高尚的道德人格和道德品质不是一夜之间能够养成的，需要一个长期的积善过程。（ ）",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},868326,"堆放的模板及木料应堆放在下风向，离火源不得小于30m，且料场四周应设置灭火器材。（ ）",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},868327,"滑模是依靠自升式爬升支架使大模板完成提升、下降、就位、校正和固定等工作的模板系统。（ ）",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},868328,"模板安装应按设计与施工说明书顺序拼装。木杆、钢管、门架及碗扣式等支架立柱不得混用。（ ）",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},868329,"用大模板浇筑墙体，待浇筑的混凝土的强度达到1MPa就可拆除大模板，待混凝土强度达到3MPa及以上时才能在其上吊装楼板。（ ）",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},868330,"对梁和板安装二次支撑前，其上可有施工荷载，支撑的位置应正确。安装后所传给支撑或连接件的荷载不应超过其允许值。（ ）",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},868331,"模板安装前必须审查模板结构设计与施工说明书中的荷载、计算方法、节点构造、安全措施，设计审批手续应齐全。（ ）",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},868332,"施工现场常用的木模板多为多层实木板，国家制定《混凝土模板用胶合板》标准，对模板的尺寸、材质、加工提出了规定。（ ）",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},868333,"当承重焊接钢筋骨架和模板一起安装时，应符合下列规定：梁的侧模、底模必须固定在承重焊接钢筋骨架的节点上（ ）。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},868334,"钢模板的优点是拆模快、容易周转，不足之处是仅能用在钢筋混凝土结构的楼盖施工中。（ ）",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},868335,"当层间高度大于5m时，应选用析架支模或钢管立柱支模。当层间高度小于或等于3m时，可采用木立柱支模。（ ）",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},868336,"安装圈梁、阳台、雨棚及挑檐等模板时，模板的支撑应自成系统，不得交搭在施工脚手架上。（ ）",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},868337,"模板支架可调托座的伸出顶层水平杆或双槽钢托梁的悬臂长度严禁超过650mm，且丝杆外露长度严禁超过400mm，可调托座插入立杆或双槽钢托梁长度不得小于150mm。（ ）",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},868338,"某公司承建的培训中心项目，局部层高达8.2m，为保证该处高支模体系的安全施工，项目部编制了高大模板支撑体系专项施工方案，并按规定要求对方案进行了审核，但未组织专家论证。2010年10月21日，项目经理安排了木工班组搭设该处高支模，并于3天后开始混凝土的浇筑，绕筑过程中发生坍塌事故，导致2人死亡。针对此类事故，请结合所学知识，回答以下问题： 高大模板支撑系统搭设前，建设单位项目负责人、勘察设计人员方案编制人员应根据施工方案和有关规范、标准的要求，对现场旁站人员、监理人员、管理人员、安全员、操作班组作业人员等进行安全技术交底。（ ）",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},868339,"模板支撑的架体，其水平杆与立杆连接作用的扣件必须采用扭矩扳手对其进行抽检，其扭矩值必须达到20～35N·m。（ ）",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},868340,"爬升设备每次使用前均应检查，液压设备应由专人操作。（ ）",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},868341,"拆除模板时，施工人员必须站在安全地方。应先拆内外木楞、再拆木面板；钢模板应先拆钩头螺栓和内外钢楞，后拆U型卡和IJ型插销，拆下的钢模板应妥善传递或用绳钩放置地面，不得抛掷。（ ）",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},868342,"高大模板支撑系统搭设前，施工单位应当根据专项施工方案和有关规范、标准的要求，对现场管理人员和操作班组作业人员进行安全技术交底。（ ）",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},868343,"拆除模板时，严禁用铁棍或铁锤乱砸，已拆下的模板应妥善传递或用绳钩放至地面。（ ）",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},868344,"柱模分片拆除的顺序应为：拆除全部支撑系统，自上而下拆除柱箍及横楞，拆掉柱角U形卡，原地清理，分2片或4片拆除模板，刷防锈油或脱模剂，分片运至新支模地点备用。（ ）",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},868345,"施工单位应严格按照专项施工方案组织施工。高大模板支撑系统搭设、拆除及混凝土浇筑过程中，应有专业技术人员进行现场指导，设专人负责安全检查，发现险情，立即停止施工并采取应急措施；排除险情后，方可继续施工。（ ）",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},868346,"在有斜支撑的位置，应于两侧模间采用垂直撑连成整体（ ）。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},868347,"2015年2月，某市建筑安全监督站对辖区内一在建大型商场进行了安全生产检查，发现该工程模板工程及支撑体系、脚手架工程、土方开挖工程为危险较大的分部分项工程及超过一定规模的危险性较大的分部分项工程。施工单位对不需专家论证的施工方案，现场编制后直接报送监理单位，经总监审批后，现场按照该方案进行了实施。对需要进行专家论证的方案，该施工单位组织了专家论证会，专家组对方案提出了修改意见，施工单位按照论证意见进行了方案修改。在实施过程中，因现场情况发生了变化，施工单位对方案进行了调整，并按照调整的方案进行了施工。请根据背景资料，回答下列问题： 施工单位组织了专家论证会，专家组对论证内容提出了明确的意见，施工单位应按照意见进行方案修改。（ ）",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},868348,"某公司承建的培训中心项目，局部层高达8.2m，为保证该处高支模体系的安全施工，项目部编制了高大模板支撑体系专项施工方案，并按规定要求对方案进行了审核，但未组织专家论证。2010年10月21日，项目经理安排了木工班组搭设该处高支模，并于3天后开始混凝土的浇筑，绕筑过程中发生坍塌事故，导致2人死亡。针对此类事故，请结合所学知识，回答以下问题： 建设单位对高大模板支撑系统的搭设、拆除及混凝土浇筑实施巡查，发现安全隐患应当责令整改。（ ）",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},868349,"已拆除了模板的结构，应在混凝土强度达到设计强度值后方可承受全部设计荷载。若在未达到设计强度之前需在结构上加置施工荷载，应另行核算；强度不足时，应加设临时支撑。（ ）",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},868350,"柱模分散拆除的顺序应为：拆除拉杆或斜撑，自下而上拆除柱箍或横楞，拆除竖楞，自下而上拆除配件及模板，运走分类堆放，清理、拔钉，钢模维修，刷防锈油或脱模剂，人库备用。（ ）",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},868351,"2015年2月，某市建筑安全监督站对辖区内一在建大型商场进行了安全生产检查，发现该工程模板工程及支撑体系、脚手架工程、土方开挖工程为危险较大的分部分项工程及超过一定规模的危险性较大的分部分项工程。施工单位对不需专家论证的施工方案，现场编制后直接报送监理单位，经总监审批后，现场按照该方案进行了实施。对需要进行专家论证的方案，该施工单位组织了专家论证会，专家组对方案提出了修改意见，施工单位按照论证意见进行了方案修改。在实施过程中，因现场情况发生了变化，施工单位对方案进行了调整，并按照调整的方案进行了施工。请根据背景资料，回答下列问题： 实施的过程中，因现场情况发生了变化，施工单位对方案进行了调整，调整后的方案可以不进行论证。（ ）",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},868352,"模板支架可调底座调节丝杆外露长度不应大于300mm，作为扫地杆的最底层水平杆离地高度不应大于550mm。（ ）",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},868353,"高大模板支撑系统搭设前，施工单位项目经理应当根据专项施工方案和有关标准、规范的要求，对现场管理人员、操作班组作业人员进行安全技术交底，并履行签字手续（ ）。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},868354,"高大模板支撑系统是模板工程的重要组成部分。（ ）",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},868355,"当支撑高度超过8m，或施工总荷载大于15KN\u002F㎡，或集中线荷载大于20KN\u002Fm的支撑架，扫地杆的设置层应设置水平剪刀撑；（ ）。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},868356,"安装悬挑结构模板时，应搭设脚手架或悬挑工作台，并设置防护栏杆和安全网。作业处的下方可以有人通行或停留。（ ）",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},868357,"木立柱间距、扫地杆、水平拉杆剪刀撑的设置应符合《建筑施工模板安全技术规范》（JGJ162）的规定，可使用板皮替代规定的拉杆。（ ）",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},868358,"2015年2月，某市建筑安全监督站对辖区内一在建大型商场进行了安全生产检查，发现该工程模板工程及支撑体系、脚手架工程、土方开挖工程为危险较大的分部分项工程及超过一定规模的危险性较大的分部分项工程。施工单位对不需专家论证的施工方案，现场编制后直接报送监理单位，经总监审批后，现场按照该方案进行了实施。对需要进行专家论证的方案，该施工单位组织了专家论证会，专家组对方案提出了修改意见，施工单位按照论证意见进行了方案修改。在实施过程中，因现场情况发生了变化，施工单位对方案进行了调整，并按照调整的方案进行了施工。请根据背景资料，回答下列问题： 施工单位对不需专家论证的施工方案，编制后不需审核可以直接报送监理单位审批。（ ）",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},868359,"梁、板结构的模板应先拆板的底模，再拆梁侧模和梁底模，并应分段分片进行，也可以成片撬落或成片拉拆。（ ）",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},868360,"在支架的外侧周边及内部纵横向每隔5～6m，应由底至顶设置连续竖向剪力撑（ ）。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},868361,"支模应按规定的作业程序进行，模板未固定前不得进行下一道工序。操作高度不够可利用连接件和支撑件进行攀登上下。（ ）",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},868362,"扣件式钢管脚手架当使用竹笆脚手脚板时，纵向水平杆应采用直角扣件固定在横向水平杆上，并应等间距设置，间距不应大于400mm。（ ）",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},868363,"某玫瑰园小区住宅楼工地，外包队工人在拆除北侧外侧脚手架时，在未系安全带的情况下，进行拆除作业，不慎坠落，经送医院抢救无效死亡，针对此类事故，请结合所学知识，回答以下问题： 落地式外脚手架的搭设高度超过规范规定的要进行设计算，设计计算的内容包括纵向、横向水平杆等受弯构件的强度和连接扣件的抗滑承载力计算。（ ）",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},868364,"附着式升降脚手架附着支承结构应包括附墙支座、悬臂梁及斜拉杆，在升降工况下，附墙支座上应设有防倾覆、导向的结构装置。（ ）",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},868365,"纵向水平杆的对接扣件应交错布置：两根相邻纵向水平杆的接头宜设置在同步或同跨内；不同步或不同跨两个相邻接头在水平方向错开的距离不应小于500mm（ ）。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},868366,"脚手架在使用过程中可以不定期检查，发现问题时再检查。（ ）",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},868367,"附着式升降脚手架使用、提升和下降阶段均应对防坠、防倾覆装置进行检查。（ ）",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},868368,"承插式盘扣脚手架业层的脚手板架体外侧应设挡脚板、防护栏杆，并在脚手架外侧立面满挂密目安全网；防护上栏杆宜设置在离作业层高度为500mm处，防护中栏杆宜设置在离作业层高度为500mm处。（ ）",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},868369,"附着升降脚手架的架体架体高度不应大于5倍楼层高。（ ）",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},868370,"脚手架工程施工单位必须具有相应的专业承包资质及安全生产许可证。（ ）",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},868371,"承插式盘扣脚手架连墙件应设置在有水平杆的盘扣节点旁，连接点至盘扣节点距离不应大于100mm；当采用钢管扣件作连墙杆时，连墙杆应采用直角扣件与立杆连接。（ ）",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]