[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-868432":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},868432,558,3,"判断题","基坑开挖前，建设单位应当按照专项施工方案的要求，对有关措施进行全面检查，确保毗邻建筑物、构筑物和地下管线等重要部位的专项防护措施落实到位。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"基坑开挖前，施工单位应当按照专项施工方案的要求，对有关措施进行全面检查，确保毗邻建筑物、构筑物和地下管线等重要部位的专项防护措施落实到位。严禁在不具备安全生产条件下强令违章作业、盲目施工。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省C2证（土建安全员）","建筑工程",0]