[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-868359":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},868359,558,3,"判断题","梁、板结构的模板应先拆板的底模，再拆梁侧模和梁底模，并应分段分片进行，也可以成片撬落或成片拉拆。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"梁、板模板应先拆梁侧模，再拆板底模，最后拆除梁底模，并应分段分片进行，严禁成片撬落或成片拉拆。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省C2证（土建安全员）","建筑工程",0]