[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-868349":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},868349,558,3,"判断题","已拆除了模板的结构，应在混凝土强度达到设计强度值后方可承受全部设计荷载。若在未达到设计强度之前需在结构上加置施工荷载，应另行核算；强度不足时，应加设临时支撑。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"已拆除了模板的结构，应在混凝土强度达到设计强度值后方可承受全部设计荷载。若在未达到设计强度之前需在结构上加置施工荷载，应另行核算；强度不足时，应加设临时支撑。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省C2证（土建安全员）","建筑工程",0]