[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-868344":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},868344,558,3,"判断题","柱模分片拆除的顺序应为：拆除全部支撑系统，自上而下拆除柱箍及横楞，拆掉柱角U形卡，原地清理，分2片或4片拆除模板，刷防锈油或脱模剂，分片运至新支模地点备用。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"分片拆除的顺序应为：拆除全部支撑系统，自上而下拆除柱箍及横楞，拆掉柱角U形卡，分2片或4片拆除模板，原地清理，刷防锈油或脱模剂，分片运至新支模地点备用。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省C2证（土建安全员）","建筑工程",0]