[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-867760":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},867760,558,2,"多选题","危险等级为Ⅰ级、Ⅱ级的（ ）的施工作业，应单独进行安全技术交底。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","分部分项工程",true,{"key":16,"text":17,"correct":18},"B","单位工程",false,{"key":20,"text":21,"correct":14},"C","机械设备",{"key":23,"text":24,"correct":18},"D","电气设备",{"key":26,"text":27,"correct":14},"E","设施安装拆卸","ACE","危险等级为Ⅰ级、Ⅱ级的分部分项工程、机械设备及设施安装拆卸的施工作业，应单独进行安全技术交底。",{"id":6,"name":31,"category":32,"favorite":33},"江苏省C2证（土建安全员）","建筑工程",0]