[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-867417":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},867417,558,1,"单选题","当深度超过（ ）m时，操作人员应设梯上下。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":18},"B","2",true,{"key":20,"text":21,"correct":14},"C","3",{"key":23,"text":24,"correct":14},"D","4","地面以下支模应先检查土壁的稳定情况，当有裂纹或存在塌方危险时，应采取安全防范措施后，方可下人作业。当深度超过2m时，操作人员应设梯上下。",{"id":6,"name":27,"category":28,"favorite":29},"江苏省C2证（土建安全员）","建筑工程",0]