[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-867407":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},867407,558,1,"单选题","在承重焊接钢筋骨架作配筋的结构中，承受混凝土重量的模板，应在混凝土达到设计强度的（ ）后方可拆除承重模板。当在已拆除模板的结构上加置荷载时，应另行核算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","25%",true,{"key":16,"text":17,"correct":18},"B","50%",false,{"key":20,"text":21,"correct":18},"C","80%",{"key":23,"text":24,"correct":18},"D","100%","设计荷载当混凝土未达到规定强度或已达到设计规定强度时，若需提前拆模或承受部分超，必须经过计算和技术主管确认其强度能足够承受此荷载后，方可拆除。在承重焊接钢筋骨架作配筋的结构中，承受混凝土重量的模板应在混凝土达到设计强度的25%后方可拆除承重模板。若在已拆除模板的结构上加置荷载，应另行核算。",{"id":6,"name":27,"category":28,"favorite":29},"江苏省C2证（土建安全员）","建筑工程",0]