[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-867403":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},867403,558,1,"单选题","高大模板支撑系统应在搭设完成后，由施工单位（ ）组织验收。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","企业技术负责人",false,{"key":16,"text":17,"correct":14},"B","技术负责人",{"key":19,"text":20,"correct":21},"C","项目负责人",true,{"key":23,"text":24,"correct":14},"D","监理单位总监","高大模板支撑系统应在搭设完成后，由施工单位项目负责人组织验收。",{"id":6,"name":27,"category":28,"favorite":29},"江苏省C2证（土建安全员）","建筑工程",0]