[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-866877":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},866877,557,3,"判断题","某大型商场项目施工过程中要经过基坑开挖、土方外运、桩基础及主体工程等施工工序，现场先后使用挖掘机、推土机、装载机、平地机、打桩机、压路机、混凝土搅拌机、钢筋机械、塔式起重机、施工升降机、物料提升机等机械设备。请根据背景资料回答下列问题。 在新建场地上进行碾压时，应从中间向两侧碾压。碾压时，距场边缘不应小于0.3m。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"在新建场地上进行碾压时，应从中间向两侧碾压。碾压时，距场边缘不应小于0.5m。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省C1证（机械安全员）","建筑工程",0]