[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-865241":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},865241,556,3,"判断题","对于房屋建筑工程，临时消防设施的设置与在建工程主体机构施工进度差距不应超过4层。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"临时消防设施的设置应与在建工程的施工保持同步。对于房屋建筑工程，临时消防设施的设置与在建工程主体结构施工进度的差距不应超过3层。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省B证（项目负责人）","建筑工程",0]