[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-865227":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},865227,556,3,"判断题","基坑工程应按设计要求进行地面硬化，并在周边设置防水围挡和防护栏杆。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"基坑工程应按设计要求进行地面硬化，并在周边设置防水围挡和防护栏杆。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省B证（项目负责人）","建筑工程",0]