[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-865222":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},865222,556,3,"判断题","模板及其支撑体系的施工荷载可随意堆置，并不得超过设计计算要求。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"模板工程应按相关规定编制施工方案，施工单位分管负责人审批签字；项目分管负责人组织有关部门验收，经验收合格签字后，方可作业。模板工程在绑扎钢筋、粉刷模板、支拆模板时应保证作业人员有可靠立足点，作业面应按规定设置安全防护设施。模板及其支撑体系的施工荷载应均匀堆置，并不得超过设计计算要求。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省B证（项目负责人）","建筑工程",0]