[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-865177":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},865177,556,3,"判断题","脚手架拆除作业应从上耐下逐层进行，可以上下同时作业加快进度（）。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"脚手架拆除必须有项目经理或工程施工负责人签字确认可拆除通知书，方可进行拆除。作业前应制订拆除方案，保证拆除过程中脚手架的稳定性。拆除作业应从上耐下逐层进行，严禁上下同时作业。拆除的杆件严禁抛扔，应滑下或用绳系牢下落。拆除的钢管、扣件等应分类堆放，及时整理运走。在拆除作业区周围设置围栏、警告标志；拆除作业时地面要有专人监护，严禁非作业人员闯人作业区。",{"id":6,"name":21,"category":22,"favorite":23},"江苏省B证（项目负责人）","建筑工程",0]