[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-864777":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},864777,556,2,"多选题","施工现场临时用电必须建立安全技术档案,应包括的内容有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","用电施工组织设计的部分资料",false,{"key":16,"text":17,"correct":18},"B","用电工程检查验收表",true,{"key":20,"text":21,"correct":18},"C","定期检（复）查表",{"key":23,"text":24,"correct":18},"D","接地电阻、绝缘电阻等参数测定记录表",{"key":26,"text":27,"correct":18},"E","电工安装、巡检、维修、拆除工作记录。","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"江苏省B证（项目负责人）","建筑工程",0]