[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-864709":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},864709,556,2,"多选题","绿色施工要求扬尘控制要实现的目标包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","土方作业阶段达到作业区目测扬尘高度小于2M",false,{"key":16,"text":17,"correct":18},"B","土方作业阶段达到作业区目测扬尘高度小于1.5M",true,{"key":20,"text":21,"correct":18},"C","安装及装饰装修阶段，作业区目测扬尘高度小于0.5M",{"key":23,"text":24,"correct":14},"D","结构施工阶段，作业区目测扬尘高度小于1.5M",{"key":26,"text":27,"correct":18},"E","在场界四周隔档高度位置测得的大气总悬浮颗粒（TSP）月平均浓度与城市背景值的差值不大于0.08MG\u002FM3","BCE","",{"id":6,"name":31,"category":32,"favorite":33},"江苏省B证（项目负责人）","建筑工程",0]