[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-864628":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},864628,556,2,"多选题","浮动费率可与（）等因素挂钩。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程规模",false,{"key":16,"text":17,"correct":18},"B","施工企业安全生产业绩",true,{"key":20,"text":21,"correct":14},"C","工程类型",{"key":23,"text":24,"correct":14},"D","工程项目风险程度",{"key":26,"text":27,"correct":18},"E","安全生产管理状况","BE","浮动费率可与施工企业安全生产业绩、安全生产管理状况等因素挂钩。",{"id":6,"name":31,"category":32,"favorite":33},"江苏省B证（项目负责人）","建筑工程",0]