[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-864406":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},864406,556,1,"单选题","在风速达到（）m\u002Fs及以上或大雨、大雪、大雾等恶劣天气时，应停止露天的起重吊装作业",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","9",false,{"key":16,"text":17,"correct":14},"B","10",{"key":19,"text":20,"correct":14},"C","11",{"key":22,"text":23,"correct":24},"D","12",true,"在风速达到9.0m\u002Fs及以上或大雨、大雪、大雾等恶劣天气时，严禁进行建筑起重机械的安装拆卸作业。在风速达到12.0m\u002Fs及以上或大雨、大雪，大雾等恶劣天气时，应停止露天的起重吊装作业。重新作业前，应先试吊，并确认各种安全装置灵敏可靠后方可进行作业。",{"id":6,"name":27,"category":28,"favorite":29},"江苏省B证（项目负责人）","建筑工程",0]